⏰ 2023 Mach-E Scheduling Next Week (10/24) For Production Build Weeks 12/5 Through 12/19

Plant will be closed week of 12/26/22

"SCHEDULING" vs "PRODUCTION" Week explained :​
Scheduling is the act of scheduling a future production week.​
Production is the act of executing the schedule (building your Mach-E that week).​
If your vehicle is scheduled to be built/produced during the weeks listed below, you can ignore this list as this is only relating to the scheduling of future production weeks.​

ford vehicles production week schedule 2.jpg


ford vehicles production week schedule 1.jpg
 

Moomin

Well-Known Member
Joined
Mar 19, 2022
Threads
6
Messages
154
Reaction score
117
Location
North East
Vehicles
2006 civic hybrid - upgrading to MME 4 Premium
Country flag
No one posted they were scheduled last week. I wonder if these are 23MY newbies that haven’t had the “downtime” waiting so have not looked for sites yet as to what is taking so long? So 22/23 conversions may be filled for scheduling?
 

J40MME

Well-Known Member
First Name
Jeff
Joined
Apr 8, 2022
Threads
1
Messages
53
Reaction score
60
Location
Massachusetts
Vehicles
Cyber Orange Premium SR AWD (Scheduled: 12/19/22)
Country flag
My converted order, 22 select converted to 23 premium, got pulled to priority code 01 last Thursday, so we’ll see what this week brings.
 

MikeNYC

Member
Joined
Oct 14, 2022
Threads
1
Messages
20
Reaction score
11
Location
NJ
Vehicles
2022 Premium eAWD EXT Range
Country flag
Well, anyone get scheduled yet today?
 


shanky2008

Well-Known Member
Joined
Sep 7, 2022
Threads
1
Messages
74
Reaction score
44
Location
Texas
Vehicles
Ordered 2023 Mustand Mach E
Occupation
Devops Engineer
No update here too
 

MikeNYC

Member
Joined
Oct 14, 2022
Threads
1
Messages
20
Reaction score
11
Location
NJ
Vehicles
2022 Premium eAWD EXT Range
Country flag
Well if noone was scheduled today, the scheduling was delayed (again lol) to next week... which means there's still a chance for a 2022 production!

I'm still holding out hope to get the car around Jan.
 

MMETech

Member
Joined
Oct 27, 2022
Threads
0
Messages
9
Reaction score
9
Location
South Dakota
Vehicles
2021 MME GTPE
Country flag
I was scheduled yesterday for 12/5 build week. Ordered Select 3/25, converted from 22 to 23 then upgraded to GTPE.

First time poster, I've learned a lot from this forum so far.
 

MikeNYC

Member
Joined
Oct 14, 2022
Threads
1
Messages
20
Reaction score
11
Location
NJ
Vehicles
2022 Premium eAWD EXT Range
Country flag
I was scheduled yesterday for 12/5 build week. Ordered Select 3/25, converted from 22 to 23 then upgraded to GTPE.

First time poster, I've learned a lot from this forum so far.
Well... there goes what little hope I had left...
 

AKM

Member
First Name
Amanda
Joined
Oct 27, 2022
Threads
1
Messages
7
Reaction score
3
Location
Minnesota
Vehicles
2023 California Route 1 AWD ER
Country flag
My CR1 was scheduled for 12/5/22. I ordered it on 9/9/22

Ford Mustang Mach-E ⏰ 2023 Mach-E Scheduling Next Week (10/24) For Production Build Weeks 12/5 Through 12/19 IMG_20221031_012223
 
Last edited:

Lmichele

Member
Joined
Aug 15, 2022
Threads
2
Messages
15
Reaction score
5
Location
USA
Vehicles
Mustang Mach-E
Country flag
Order date 8/30/22 here. Was hoping to be in the 10/24 round of scheduling but doesn't look that way. Keeping my fingers crossed for build this year, with early 2023 delivery.
 
 