01/10/22 Build Week Chat/Gang

RickMachE

Well-Known Member
Joined
Jul 1, 2021
Threads
201
Messages
13,280
Reaction score
18,106
Location
SE MI
Vehicles
2022 Mach-E Premium 4X, 2022 Lightning Lariat
Country flag
I have that also.

Note that in addition to possibly not having the kick feature, it appears that acoustic glass has also been removed. It was in the 9/29 order guide, and not in the 12/1 order guide. Orders were converted in early October, so one would think they'd include the front door acoustic glass.
Sponsored

 
Last edited:

SpaceEVDriver

Well-Known Member
Joined
Aug 26, 2021
Threads
60
Messages
2,295
Reaction score
4,090
Location
Arizona
Vehicles
Ground-based: CA Route 1 AWD, ER
Occupation
Planetary Science
Country flag
Got my built email. Estimated delivery is 27 Feb to 5 March. I know it's not going to be the early part of that window, but I sure wish it would be. I have a long trip the week of 7 March. I'd really like to fly or drive down to Mexico City to pick up the vehicle instead of waiting...
 

DamienR

Member
First Name
Damien
Joined
Oct 5, 2021
Threads
0
Messages
7
Reaction score
20
Location
Orlando, Florida
Vehicles
2022 Mach E California Route 1 Shadow Black
Country flag
Thank you all for your info and I too have been eagerly awaiting my build. GREAT NEWS I received an email this morning around 2am that my 2022 Mustang Mach E Cali Route 1 has been built and is scheduled for delivery here in Florida between 2-13 and 2-19. Note that I was in batch 003639 with number 391/630. Appreciate all the tools these forums have given us to track and don't loose hope seems things for this build week are taking shape quickly as I went from ZERO modules to all of them in 1 day!!! Best of luck to all the future Mach E people out there awaiting there new rides!!! Been a fun but lengthy process just happy to get the one I built finally!!! (driving a MACH E now that was found on a lot but doesn't have the range I need)

Screen Shot 2022-01-22 at 12.02.30 PM.jpeg
 

Craigeddy111

Well-Known Member
First Name
Craig
Joined
Sep 17, 2021
Threads
7
Messages
677
Reaction score
957
Location
Fort Worth
Vehicles
2022 MME Premium, 2022 KIA EV6 GT Line RWD
Country flag
Thank you all for your info and I too have been eagerly awaiting my build. GREAT NEWS I received an email this morning around 2am that my 2022 Mustang Mach E Cali Route 1 has been built and is scheduled for delivery here in Florida between 2-13 and 2-19. Note that I was in batch 003639 with number 391/630. Appreciate all the tools these forums have given us to track and don't loose hope seems things for this build week are taking shape quickly as I went from ZERO modules to all of them in 1 day!!! Best of luck to all the future Mach E people out there awaiting there new rides!!! Been a fun but lengthy process just happy to get the one I built finally!!! (driving a MACH E now that was found on a lot but doesn't have the range I need)

Ford Mustang Mach-E 01/10/22 Build Week Chat/Gang Screen Shot 2022-01-22 at 12.02.30 PM
Keep us posted as you get it! ? Congrats!!!
 


JamesInWeston

Well-Known Member
First Name
James
Joined
Sep 3, 2021
Threads
15
Messages
274
Reaction score
261
Location
Weston, Florida USA
Vehicles
ordered 8-25-21: 2022 Ford Mustang Mach-E CalRt1
Occupation
Risk Management/Insurance
Country flag
Got my built email. Estimated delivery is 27 Feb to 5 March. I know it's not going to be the early part of that window, but I sure wish it would be. I have a long trip the week of 7 March. I'd really like to fly or drive down to Mexico City to pick up the vehicle instead of waiting...
I thought about the same thing. But the Level 2 and better charging situation between the plant and Texas makes it a non-starter.
 

RickMachE

Well-Known Member
Joined
Jul 1, 2021
Threads
201
Messages
13,280
Reaction score
18,106
Location
SE MI
Vehicles
2022 Mach-E Premium 4X, 2022 Lightning Lariat
Country flag
I thought about the same thing. But the Level 2 and better charging situation between the plant and Texas makes it a non-starter.
Not to mention the reality that Ford doesn't allow this. They won't even let dealers pick up vehicles from a depot that's a few miles away.
 

JeanneB

Well-Known Member
First Name
Jeanne
Joined
Dec 23, 2021
Threads
2
Messages
185
Reaction score
163
Location
Plainfield,Il
Vehicles
2023 Ford MME GT
Occupation
finance manager
Country flag
So there is a thread saying that 2022 built after Jan 3 won’t have hands free lift gate. I wonder if that’s why some of ours are just sitting while they made this call.
The hands free liftgate on my 2021 MME only works occasionally anyways.
 

JeanneB

Well-Known Member
First Name
Jeanne
Joined
Dec 23, 2021
Threads
2
Messages
185
Reaction score
163
Location
Plainfield,Il
Vehicles
2023 Ford MME GT
Occupation
finance manager
Country flag
So, my estimated delivery date is 3/7/2022 but Ford says my Mach E isn't built yet? Is this possible?
My estimated delivery is 2/14/22 but my says still in production. Pretty sure it won't make it here by then if it's not finished being built yet.
 

DamienR

Member
First Name
Damien
Joined
Oct 5, 2021
Threads
0
Messages
7
Reaction score
20
Location
Orlando, Florida
Vehicles
2022 Mach E California Route 1 Shadow Black
Country flag
Also so you can know I ordered mine on 8-26-2021, Dealer put in the actual order to Ford first week of October. Notification of Scheduled for Production start from Ford 11-4-2021. YOUR VEHICLE HAS BEEN BUILT Email today 01-22-2022!!! Excited to say the least. Estimated arrival 2-13 to 2-19 so it moves fast obviously from the build.
 

Avelli

Well-Known Member
Joined
Sep 25, 2021
Threads
2
Messages
339
Reaction score
330
Location
NorCal
Vehicles
E91 6MT RWD, 22 MME GT
Country flag
And now I have an "In Production" date, as well as an estimated delivery date (bottom date)!
 

SigSauer

Well-Known Member
First Name
Mark David
Joined
Aug 22, 2021
Threads
3
Messages
300
Reaction score
265
Location
Columbus, Ohio
Vehicles
2022 Preiumn in DMG, AWD, ER and 1928 Model A Ford
Occupation
Retired Sales Representative
Country flag
We are in the same 'batch' and getting - almost - the same car.
3541 - 129/300. Only difference is the battery-ER.
Looking forward to seeing how your order progresses.
Same batch, 3541 number 63/300 Premium, DMG, AWD and ER. Now have estimated delivery of 2/17/22.
Getting close??
 

Larry Paul

Well-Known Member
First Name
Larry
Joined
Aug 27, 2021
Threads
21
Messages
833
Reaction score
949
Location
Southern California
Vehicles
MME-GTPE, Sunbeam Tiger w1970 Boss302, 2002Rav4EV
Country flag

adam_thedad

Well-Known Member
First Name
Adam
Joined
Aug 24, 2021
Threads
15
Messages
80
Reaction score
73
Location
Orange County, CA
Vehicles
Mach E Select (Route 1 on Order)
Country flag
Got my built email today too! Estimated delivery moved up from 3/17 to 3/7-3/13.
 

capnhowdy21

Well-Known Member
First Name
Dan
Joined
Oct 21, 2021
Threads
3
Messages
174
Reaction score
231
Location
Media, PA
Vehicles
2022 MachE Premium, 2021 Subaru Crosstrek
Occupation
Development Manager
Country flag
I was hoping to have my car for my birthday, but at least it’s built date is my bday. I can say my car shares the same bday.
Sponsored

 
 




Top