That is good to know. Thank you. It was low 50s kw around 70% for select. I guess ER would be a little higher rate to compensate for the bigger size in order to accomplish the same charging time. There was a bus at the same EA station and it was charging constantly at 140kw. Based on the SOC, that Genentech bus must have 600 kwh battery. He was paying around 10 cents per kwh.20 to 80% is about the same time for either one.