5/30 Build Week Gang

donwell

Active Member
First Name
Don
Joined
Apr 13, 2022
Threads
0
Messages
29
Reaction score
23
Location
California
Vehicles
Mustang Mach E CR1
Country flag

shelnian

Well-Known Member
First Name
Ian
Joined
Apr 25, 2022
Threads
1
Messages
278
Reaction score
173
Location
Seattle
Vehicles
2022 MME Premium AWD
Occupation
Retired
Country flag
10/4/22 Order Space White AWD Extended Range. Does 5/30 indicate the build Start Date or Build Completion Date? (I assume Start)
I read the build date is the final assembly date, so it should be ready to ship the next day. Also read the final assembly takes about 11 to 18 hours.
 
OP
OP
SD Marc

SD Marc

Well-Known Member
First Name
Marc
Joined
Jan 23, 2022
Threads
11
Messages
97
Reaction score
128
Location
San Diego, CA
Vehicles
2022 MachE Premium
Occupation
Tech Marketing Exec.
Country flag
Still holding at 5/30 for build date ... but got an email this AM with VIN#... so this is finally starting to feel like it will happen :)
 

MME_Adventurist

Well-Known Member
First Name
Zack
Joined
Nov 24, 2021
Threads
3
Messages
150
Reaction score
55
Location
Eastern Panhandle WV
Vehicles
2022 Mach E Select RWD Comfort & Tech Package
Country flag
Hey Gang! I got pushed back from 5/9 to 5/16 to 5/23 and now I'm here! yippy!
 

MME_Adventurist

Well-Known Member
First Name
Zack
Joined
Nov 24, 2021
Threads
3
Messages
150
Reaction score
55
Location
Eastern Panhandle WV
Vehicles
2022 Mach E Select RWD Comfort & Tech Package
Country flag
Mine's still holding for the week of 5/30 as well... here's to hoping the date holds!
how do you add the little table with your stats on your post?
 


1969Mach1Mike

Well-Known Member
First Name
Mike
Joined
Jul 3, 2021
Threads
25
Messages
258
Reaction score
259
Location
CO
Vehicles
69mach1, 11 R56S MINI, LR LR4, Mach-E IBSM.
Occupation
Minister Of Awesomeness
Country flag
MY 5/30 was bumped to 6/13 now it is 6/20.
 

levineds

Well-Known Member
Joined
Apr 11, 2022
Threads
0
Messages
99
Reaction score
102
Location
Bay Area, CA
Vehicles
2008 Honda Civic, 2022 Premium ER RWD
Country flag
Was originally scheduled for 5/16, pushed back to 5/23, now pushed back to 5/30. Let's hope that's enough slippage.
 

sabbyzaki

Well-Known Member
Joined
Oct 7, 2021
Threads
0
Messages
59
Reaction score
30
Location
Washington
Vehicles
Ford Mach-E, Nissan 370Z
Country flag
I got bumped from 5/16 to 5/30. This is now my home, hoping it sticks
 

sborsch

Well-Known Member
First Name
Steve
Joined
Jan 21, 2022
Threads
17
Messages
122
Reaction score
257
Location
Southern California
Vehicles
2022 MME; 2020 Lexus NX300 Hybrid
Occupation
I.T. Consultant
Country flag
I do hesitate saying much about my order date of 12/19/21, initial build date the week of 5/16, having it slip to 5/23, and then *again* yesterday to 5/30. Mainly since I don’t want to be like this kid:

Ford Mustang Mach-E 5/30 Build Week Gang 2670EFFC-2CFB-45E8-8733-6499B89C8B2A


My dealer rep told me just now that, based on the other MMEs they’ve ordered and the lead time to dealer arrival, I should expect the car to be there by the first week of July (except for the 4th of July weekend getting in the way). Also that “you’re not alone” in being highly frustrated by the uncertainty, delays, and lack of Ford ongoing communication.

So it appears that we in this 5/30 build week may get ours relatively soon and, hopefully, before 2023 ordering begins. Sniff.
 

Bigfeets

Well-Known Member
First Name
JM
Joined
Dec 10, 2021
Threads
5
Messages
1,403
Reaction score
820
Location
Southern California
Vehicles
Ford MMe premium order. Hyundai Ioniq 5 Lrd
Occupation
retired
Country flag
I do hesitate saying much about my order date of 12/19/21, initial build date the week of 5/16, having it slip to 5/23, and then *again* yesterday to 5/30. Mainly since I don’t want to be like this kid:

Ford Mustang Mach-E 5/30 Build Week Gang 2670EFFC-2CFB-45E8-8733-6499B89C8B2A


My dealer rep told me just now that, based on the other MMEs they’ve ordered and the lead time to dealer arrival, I should expect the car to be there by the first week of July (except for the 4th of July weekend getting in the way). Also that “you’re not alone” in being highly frustrated by the uncertainty, delays, and lack of Ford ongoing communication.

So it appears that we in this 5/30 build week may get ours relatively soon and, hopefully, before 2023 ordering begins. Sniff.
may the FORD be with you.
Ford Mustang Mach-E 5/30 Build Week Gang 1651889971164
 

MME_Adventurist

Well-Known Member
First Name
Zack
Joined
Nov 24, 2021
Threads
3
Messages
150
Reaction score
55
Location
Eastern Panhandle WV
Vehicles
2022 Mach E Select RWD Comfort & Tech Package
Country flag
Just go to your profile settings and there's the section for editing your signature... you can add a table in there.
Thanks!
 

rcechinel

Well-Known Member
First Name
Rod
Joined
Dec 30, 2021
Threads
4
Messages
623
Reaction score
588
Location
Atlanta
Vehicles
2022 Mach-E Premium ER AWD
Occupation
Tech
Country flag
Bumped down to 6/6
 

shelnian

Well-Known Member
First Name
Ian
Joined
Apr 25, 2022
Threads
1
Messages
278
Reaction score
173
Location
Seattle
Vehicles
2022 MME Premium AWD
Occupation
Retired
Country flag
Was bumped to 6/6 last week, but this week I got a build date of 5/31. Things must be improving at the factory.
 

rcechinel

Well-Known Member
First Name
Rod
Joined
Dec 30, 2021
Threads
4
Messages
623
Reaction score
588
Location
Atlanta
Vehicles
2022 Mach-E Premium ER AWD
Occupation
Tech
Country flag
Trying to wrap my head around these discrepancies. Sequence of events:

- On 4/22, the dealer emails me telling the good news: car has been scheduled for production for the week of 5/30 and provides the VIN. 2 days later I could add the VIN to Fordpass. No emails from Ford.
- https://shop.ford.com/vehicleordertracking showing that car will be placed on next available production spot (which means it's not scheduled yet, right?!)
- This past Friday (5/13), I finally received an email from Ford confirming production date for 6/6 (bumped down a week), and same VIN dealer has informed me before.
Ford Mustang Mach-E 5/30 Build Week Gang 1652704362064


- Today the status on the tracker is still the same (not scheduled):
Ford Mustang Mach-E 5/30 Build Week Gang 1652704231995


It's probably a case of right hand doesn't talk to left hand, but I'd like to double check to make sure I'm falling on a crack of the system. Any suggestions or thoughts?
 
 




Top