BlueCruise going out OTA to regular plebs (non-EA owners)!

KDub

Well-Known Member
First Name
Kevin
Joined
Jul 26, 2021
Threads
10
Messages
168
Reaction score
185
Location
Northern California
Vehicles
2021 Mach E CA Route 1
Country flag
2.71 today on my Job 1, May build, non-EA. Also received the letter. 2.60 was about 10 days ago.
After 2.71 on Tuesday, notification in FordPass today (Friday) that 2.72 is scheduled to update and prompted me to check my update schedule (I have it set for 12:10 am every day). Job 1, May build, non-EA.
 

Mathington

Well-Known Member
Joined
Jul 6, 2021
Threads
19
Messages
829
Reaction score
826
Location
Canada
Vehicles
Mach-E Premium SR AWD
Country flag
2.4.3 is supposedly the same as 2.7.3, just the old numbering. Guess we will see when it installs.
I'm hoping that 2.4.3 will install and then they will push 2.7.4 afterwards.
 


Brian707

Well-Known Member
Joined
May 20, 2021
Threads
5
Messages
165
Reaction score
198
Location
Illinois
Vehicles
2021 Infinite Blue Mustang Mach E Premium AWD EXT
Country flag
2.6.0 Tuesday, nothing since here. May of 2021 build
 

Mathington

Well-Known Member
Joined
Jul 6, 2021
Threads
19
Messages
829
Reaction score
826
Location
Canada
Vehicles
Mach-E Premium SR AWD
Country flag
2.6.0 Tuesday, nothing since here. May of 2021 build
It
Took about two weeks for me to go from 2.6.0 to 2.7.1 if I remember correctly.
Same here, it took some time for me to go from 2.6.0 to 2.7.1 I believe. Then it has been 2+ weeks that I have been sitting on 2.7.2 until today when I get 2.4.3 pushed to my car.
 

Mathington

Well-Known Member
Joined
Jul 6, 2021
Threads
19
Messages
829
Reaction score
826
Location
Canada
Vehicles
Mach-E Premium SR AWD
Country flag
My progress was 2.7.2 to 2.4.3 to 2.7.4. Now I've been sitting on 2.7.4 for a couple weeks.
wow, really? I wonder what is causing the delays between roll outs, my father-in-law lives in the same city, has the same spec Job 1 as I do and his was non-stop updates from 2.6.0 to 2.8.3

I wonder why there would be such a difference in the deployments.
 

unhandled

Well-Known Member
First Name
Mathieu
Joined
Jul 28, 2021
Threads
13
Messages
176
Reaction score
173
Location
Stoke, Quebec, Canada
Vehicles
Mustang Mach-E Premium AWD ER
Country flag
Looks like I am headed down the same path. 2.4.3 queued up now.
Yeah I’m confused as to why the old numbering scheme is used. 2.4.3 shows as downloading at the moment. I had 2.7.2 last week, was expecting to see 2.7.3 as the others had.
 

Jimmy2

Well-Known Member
First Name
Jimmy
Joined
Jan 23, 2021
Threads
17
Messages
661
Reaction score
812
Location
Wilmington NC
Vehicles
21 MME Premium 4EX; 23 MME GTPE Vapor Blue Met
Country flag
Dealer loaded BC into my Job 1 Mustang about two weeks ago. I'm enjoying the heck out of it here in eastern NC.
 

Dnorwood98

Well-Known Member
First Name
D
Joined
Mar 18, 2021
Threads
14
Messages
272
Reaction score
215
Location
WA
Vehicles
2021 Carbonized Gray AWD Ext Range
Occupation
Education/Healthcare
Country flag
Yeah I’m confused as to why the old numbering scheme is used. 2.4.3 shows as downloading at the moment. I had 2.7.2 last week, was expecting to see 2.7.3 as the others had.
I am guessing that there is some kind of difference between 4.3 and 7.3 that our cars do not need because it was installed in an earlier update??

Complete guess with no evidence.
Sponsored

 
 




Top