Comprehensive PowerUp (OTA) Poll (1.x-2.x)

What is your Mach E's current PowerUp level?


  • Total voters
    500

Dnorwood98

Well-Known Member
First Name
D
Joined
Mar 18, 2021
Threads
14
Messages
272
Reaction score
215
Location
WA
Vehicles
2021 Carbonized Gray AWD Ext Range
Occupation
Education/Healthcare
Country flag
All of your OTA’s came in on the exact same days as mine! Currently at 2.7.4.
We were on the same OTA schedule until I got 2.7.4 on on June 13 (Monday). The rollout is very interesting to me. Nothing since then. Guess I will see around noon if I get 2.8.1.
Sponsored

 

RockwallRick

Well-Known Member
Joined
Apr 15, 2021
Threads
12
Messages
1,647
Reaction score
1,557
Location
Lake Wales, Florida
Vehicles
22 Ford Maverick FX4
Country flag
I got 2.8.1. a few hours ago. Hoping 2.8.2 queues up so I can BlueCruise tomorrow
How long did it take for 2.8.1 to install? This one should be coming up next for me and I am trying to decide whether or not to do update now or have it install during my scheduling timeframe.
 

cbcasas

Well-Known Member
First Name
Christopher
Joined
Jun 8, 2022
Threads
7
Messages
272
Reaction score
141
Location
Southern California
Vehicles
Mustang Mach-E First Edition
Country flag
How long did it take for 2.8.1 to install? This one should be coming up next for me and I am trying to decide whether or not to do update now or have it install during my scheduling timeframe.
It says it’ll take 140 minutes but it definitely only took about 70-80 minutes.
 

Mathington

Well-Known Member
Joined
Jul 6, 2021
Threads
19
Messages
828
Reaction score
825
Location
Canada
Vehicles
Mach-E Premium SR AWD
Country flag
How long did it take for 2.8.1 to install? This one should be coming up next for me and I am trying to decide whether or not to do update now or have it install during my scheduling timeframe.
I haven't had it install for me yet, but I've read elsewhere on the forum that it could take 143 minutes or something to install. It's one of the longer updates as it is updating all the cameras.
 

RockwallRick

Well-Known Member
Joined
Apr 15, 2021
Threads
12
Messages
1,647
Reaction score
1,557
Location
Lake Wales, Florida
Vehicles
22 Ford Maverick FX4
Country flag
I haven't had it install for me yet, but I've read elsewhere on the forum that it could take 143 minutes or something to install. It's one of the longer updates as it is updating all the cameras.
Since this one takes so long, do you think it would be a good idea to do it when the car is plugged in for level 2 charging? I am a little concerned that maybe the 12v battery could be drained but hopefully the HVB will keep it charged up?
 


Mathington

Well-Known Member
Joined
Jul 6, 2021
Threads
19
Messages
828
Reaction score
825
Location
Canada
Vehicles
Mach-E Premium SR AWD
Country flag
Since this one takes so long, do you think it would be a good idea to do it when the car is plugged in for level 2 charging? I am a little concerned that maybe the 12v battery could be drained but hopefully the HVB will keep it charged up?
If you have home charging, I would keep the car plugged in. I usually keep the car plugged in and let the car install the update during the scheduled time but I don't know if it's required.
 

RockwallRick

Well-Known Member
Joined
Apr 15, 2021
Threads
12
Messages
1,647
Reaction score
1,557
Location
Lake Wales, Florida
Vehicles
22 Ford Maverick FX4
Country flag
If you have home charging, I would keep the car plugged in. I usually keep the car plugged in and let the car install the update during the scheduled time but I don't know if it's required.
So far I have been doing update now for the ones that take less than 30 minutes. Haven‘t done a scheduled update yet but I think I will for this one! I will make sure the car is plugged in to my GrizzlE prior to the scheduled time.
 

cbcasas

Well-Known Member
First Name
Christopher
Joined
Jun 8, 2022
Threads
7
Messages
272
Reaction score
141
Location
Southern California
Vehicles
Mustang Mach-E First Edition
Country flag
2021 First Edition here

Installed:
2.6.0 on May 31st
2.7.1 on June 2nd
2.7.2 on June 9th
2.7.3 on June 10th
2.7.4 on June 13th
2.8.1. on June 14th
And 2.8.2 status is "request_delivery_queued" as of today June 15th. Hopefully BlueCruising by the end of the day! EDIT: And done!
 
Last edited:

Trick.Mach-E

Well-Known Member
First Name
Trick
Joined
Mar 8, 2021
Threads
6
Messages
280
Reaction score
487
Location
Earth
Vehicles
Old Raptor, Mach-E4x, New Raptor, F-250, Taycan.
Occupation
Computer Nerd
Country flag
Once again after about 24 hours since we received the 2.8.2 OTA we are now queued up for 2.8.3! I will try to have it install manually when I get home from work later today. :)
 

OH2AZ2OH

Well-Known Member
Joined
Jan 11, 2021
Threads
6
Messages
580
Reaction score
699
Location
Dublin, OH
Vehicles
Mach E 4X
Country flag
2.8.1 queued yesterday and installed overnight. Am I correct in remembering to not expect an OTA on a weekend?
 

frumple

Member
Joined
Jun 25, 2020
Threads
1
Messages
16
Reaction score
15
Location
VA
Vehicles
Mach-E Premium AWD
Country flag
I got 2.8.2 on 6/17 (I think)... My car has been on an absolute tear the past 2-3 weeks.

I could look at all the timestamps for the pictures/screenshots I took but I'd say I got this much in past month or so...

2.6.0
2.7.1
2.7.2
2.7.3
2.7.4
2.7.5
2.8.1
2.8.2

The 2.8.1 and 2.8.2 was in the past week.

I feel like maybe one of them I didn't even notice or get, like maybe 2.7.5

Kinda surprised I haven't yet gotten 2.8.3 at the pace it was going. I usually noticed gigabyte(s) on router download history from the onboard modem and usually the next day it would get installed (I have mine set to install every night at 11 PM if there is an update)

Cheers! I've been impressed with the recent catch up in updates and improvement in Update notifications (both in FordPass app and in car) and change version notes. It was quite a few months there in winter and spring where there was... nothing.


Edit 6/21/22.... I got 2.8.3 installed on 6/20/22. Cheers!
 
Last edited:
 




Top