MitchAK
Well-Known Member
- First Name
- Greg
- Joined
- Dec 22, 2020
- Threads
- 10
- Messages
- 135
- Reaction score
- 216
- Location
- Alaska
- Vehicles
- 2021 MME 4X IB , 2021 F150 Hybrid
- Occupation
- Power Production
- Thread starter
- #1
Sorry, I haven’t kept up with the forum so much lately.
I have an ETA of 3/22 and the vehicle had already spent a lot of time in Kansas held on the stop ship since before the service bulletin came out for the subframe bolts.
It has an actual Argentine ramp date of March 9.
Build date, 1/28/2021
Ship date 2/10/2021
ETA 3/22/2021
Has everyone been receiving, or reporting of cars still hitting their ETA?
TIA
I have an ETA of 3/22 and the vehicle had already spent a lot of time in Kansas held on the stop ship since before the service bulletin came out for the subframe bolts.
It has an actual Argentine ramp date of March 9.
Build date, 1/28/2021
Ship date 2/10/2021
ETA 3/22/2021
Has everyone been receiving, or reporting of cars still hitting their ETA?
TIA
Sponsored