Jeff_S
Well-Known Member
- First Name
- Jeff
- Joined
- Apr 28, 2021
- Threads
- 1
- Messages
- 68
- Reaction score
- 86
- Location
- Durham, NC
- Vehicles
- MME GT Performance
I'm in the same situation. Chip hold, finished being built (aside from the missing chips I guess) around the same time as yours. Nothing interesting in the trackers since then. Still showing 31 October delivery, but I don't believe that.Mine is a fully loaded GTPE. I suppose it could be an option that takes more or certain chips that is holding it up. Build week Aug 23. VVR shows it was finished Sept 2 but on chip hold. My tracker still says in production so zero movement for 3 weeks now.
Also hurts considering I reserved Jan2020 and people are complaining about a 4 month wait. Try 21 months
Sponsored