How many days does it take to produce a Mach E ?
Sponsored

 

hybrid2bev

Well-Known Member
Joined
Dec 4, 2019
Threads
75
Messages
4,101
Reaction score
11,195
Location
USA
Vehicles
2021 Job 1 Premium4X - EAP Member
Country flag
How many days does it take to produce a Mach E ?
Depends on your definition of 'produce'.

Order to delivery, yeah probably anywhere from 3-6 months nowadays.

Back when mine was built in mid-Dec 2020 it was about a 10 day process to actually build the vehicle. From the time it was 'Sent to Plant' (12-07-20) to the day it was considered 'produced' (12-17-20).
 

Foolsk

Member
First Name
Steve
Joined
Jun 15, 2021
Threads
3
Messages
19
Reaction score
26
Location
Columbus,IN
Vehicles
Lincoln Corsair. Mustang Mach E soon
Occupation
Retired
Country flag
48 hrs total
 

Cobra427

Well-Known Member
First Name
John
Joined
Jun 1, 2021
Threads
43
Messages
319
Reaction score
350
Location
Ohio
Vehicles
2021 F-150 Lariat Powerboost, 2022 Mustang Mach E
Occupation
Retired
Country flag
What is the line rate at the plant? Cars per hour?
 


agoldman

Well-Known Member
Joined
Jan 23, 2020
Threads
49
Messages
2,892
Reaction score
2,400
Location
Charleston, SC
Vehicles
GT Cyber Orange
Country flag
My GT has been in production since 7/16 and still no ETA posted as of 7/23, so it varies I guess..
 
Last edited:

Cobra427

Well-Known Member
First Name
John
Joined
Jun 1, 2021
Threads
43
Messages
319
Reaction score
350
Location
Ohio
Vehicles
2021 F-150 Lariat Powerboost, 2022 Mustang Mach E
Occupation
Retired
Country flag
What is the line rate at the plant? Cars per hour?
So apparently no one knows, so I will take a SWAG. In order to sell 50,000 MMEs the first year as predicted, they are averaging 6,000 per month, which allows for downtime and other losses. 6,000 per month divided by average 22 working days per month is 272.7 per day. Assuming two shifts production, 272.7 divided by 16 hours is 17 cars per hour.
How'd I do? Close?
 

RetiredDP

Well-Known Member
First Name
Steve
Joined
Mar 30, 2020
Threads
5
Messages
564
Reaction score
605
Location
Camino, CA
Vehicles
Focus RS
Occupation
Retired Director of Videography, Editor, Compressionist
Country flag
My GTPE was "in production" starting August 21st (which was a Saturday) and was "built" by Sept. 1st. From there it went to the Mexican parking lot to await chip assemblies. Reportedly shipped out via train on Sept. 15th. Hasn't reached the Kansas train hub yet. Ford is telling me to expect delivery to the dealer Oct. 20th-26th (I'm in Northern California), so Ford must be doing further chip assembly installs at the train hub. Trains are slow, but not 35-40 days slow.

UPDATE: Dealer told me to expect it on the 26th, ACTUAL arrival date, and the day I picked it up, was Oct. 15th.
 
Last edited:

Davedough

Well-Known Member
First Name
Dave
Joined
Oct 12, 2020
Threads
14
Messages
1,812
Reaction score
4,253
Location
West BYGOD Virginia
Vehicles
Mach E GTPE , Explorer ST
Occupation
Federal IT Sales Engineer
Country flag
My GTPE was "in production" starting August 21st (which was a Saturday) and was "built" by Sept. 1st. From there it went to the Mexican parking lot to await chip assemblies. Reportedly shipped out via train on Sept. 15th. Hasn't reached the Kansas train hub yet. Ford is telling me to expect delivery to the dealer Oct. 20th-26th (I'm in Northern California), so Ford must be doing further chip assembly installs at the train hub. Trains are slow, but not 35-40 days slow.
Not saying this is the case, but I've seen a fair share of people who were expecting a delivery by X date, actually get them at the dealer like 2 weeks early. The 35-40 days, I'm sure is just an estimate to cover their butts
 

737flyer

Well-Known Member
First Name
Richard
Joined
Jul 12, 2021
Threads
2
Messages
807
Reaction score
311
Location
Redington Beach, Fl
Vehicles
2014 BMW X 5, 2021 Mach E-Premium RWD Job 2
Occupation
Retired Airline Pilot
Country flag
Got my build date 12/15. Interesting to see when I get in production notification. I’m thinking 10 days prior. From what I’ve read the assembly line takes 10 days.
Any thoughts!
 

Kevin P

Well-Known Member
Joined
Feb 7, 2020
Threads
6
Messages
424
Reaction score
692
Location
Burlington, KY, US
Vehicles
'21 MMEGT - sold, '23 BMW i4 M50, various others
Occupation
IT
Country flag
It takes a day or so to actually build it. The car is not literally "in production" during the time the tracker shows that. The only exception would be if it was built missing some parts and then put on hold before parts (chips) were installed.
 

737flyer

Well-Known Member
First Name
Richard
Joined
Jul 12, 2021
Threads
2
Messages
807
Reaction score
311
Location
Redington Beach, Fl
Vehicles
2014 BMW X 5, 2021 Mach E-Premium RWD Job 2
Occupation
Retired Airline Pilot
Country flag
I did get my “in production “ novice on 12/7 along with the window sticker. Build date 12/15. Probably actually start the build on 12/13 and completed on 12/15. Then ship a day or two later.
 

HuntingPudel

Well-Known Member
First Name
Steve
Joined
Mar 23, 2021
Threads
66
Messages
8,227
Reaction score
9,857
Location
Bay Area, CA
Vehicles
2021 MME GT-PE, 1979 Fire-Am, 1972 K/5 Blazer
Occupation
Engineering
Country flag
My GT-PE was scheduled for production the “week of 10/4/21.” It was “built” on 10/9/21. It was “shipped” on 10/14/21. So, depending on how Ford defines these milestones… ?‍♂?