based on the original post, the 23MY units will be built through at least 6/26/2023 (Balance Out Date). the note at the top of the image also says they won't be converting any orders to 23.5MY so they'll complete all existing orders before switchover.My dealer said my Premium is scheduled for production for 5/5/2023 and is currently "in production" stage in the order tracker, if this is the case will I be getting the MY 23 or 23.5?
I got a similar email and I concur, I think job 23.5 will start production on the first week of July.I have a 2023.5 scheduled week of 7/3. I think that is the first production week for the LFP models.