chuckles
Well-Known Member
- Joined
- Apr 5, 2022
- Threads
- 4
- Messages
- 89
- Reaction score
- 131
- Location
- California
- Vehicles
- 2021 Job 1 RWD Mustang Mach E
- Thread starter
- #1
Last weekend I did a road trip and had charging failures at three different Electrify America charging stations at their brand-new “hyper fast” chargers.
I’d pull into a new 350kW charger, plug in, tap my EA membership card (from Apple Pay), and after a couple seconds and loud clicks, my car’s charging led went to blinking red, and the message on the charger would change to “reconnecting to vehicle”. A minute later, the chargers would tell me to unplug.
Two of the stations had older 150kW/Chademo chargers that were free. I moved to those and charging worked fine. I saw an F150 lightning experience the same issue.
The third station didn’t have an older charger, so I called in hoping for a remedy, and she said it was a known issue. We tried two different (new) chargers, she would do something on her end (she remotely rebooted and remotely initiated), and charging finally worked on the second charger (but it was quite slow: 50kW).
(I was able to charge fine at two other stations that had the older “glowing green empty square” charger, fwiw)
Anyone else experiencing this?
I’d pull into a new 350kW charger, plug in, tap my EA membership card (from Apple Pay), and after a couple seconds and loud clicks, my car’s charging led went to blinking red, and the message on the charger would change to “reconnecting to vehicle”. A minute later, the chargers would tell me to unplug.
Two of the stations had older 150kW/Chademo chargers that were free. I moved to those and charging worked fine. I saw an F150 lightning experience the same issue.
The third station didn’t have an older charger, so I called in hoping for a remedy, and she said it was a known issue. We tried two different (new) chargers, she would do something on her end (she remotely rebooted and remotely initiated), and charging finally worked on the second charger (but it was quite slow: 50kW).
(I was able to charge fine at two other stations that had the older “glowing green empty square” charger, fwiw)
Anyone else experiencing this?
Sponsored