New Mexico Building Statewide EV Chargers

ridgebackpilot

Well-Known Member
First Name
Michael
Joined
Mar 27, 2022
Threads
33
Messages
498
Reaction score
734
Location
Carmel Valley, CA
Vehicles
2022 MME GTPE; 2022 MME Premium ER
Occupation
Attorney
Country flag
I thought those of you who live in or frequent New Mexico might like to read the attached article from the Associated Press.
Sponsored

 

Attachments

ZuleMME

Well-Known Member
First Name
Zule
Joined
Apr 23, 2021
Threads
10
Messages
1,020
Reaction score
1,483
Location
Denver, CO
Vehicles
21' Job1 P4X MME, 22' MYP
Occupation
Implementation Engineer
Country flag
New Mexico is one of those states who might better fix there power problems before adding more high demand! One of the highest PhD per populations yet plagued with outages it appears.
 

Mach-E VLOG

Well-Known Member
First Name
Patrick
Joined
Jul 25, 2020
Threads
118
Messages
1,614
Reaction score
6,539
Location
Oceanside, CA
Website
machevlog.com
Vehicles
Mach-E GT PE - Grabber Blue - Blucifer Twocifer
Country flag
Socorro is the first one that is coming online and it helps fill in the Electrify America gap between ABQ and El Paso or Deming.
 

manicsubmersion

Well-Known Member
First Name
Kevin
Joined
Jan 20, 2022
Threads
5
Messages
48
Reaction score
76
Location
New Mexico
Vehicles
2022 F150 hybrid Lariat, 2022 MachE AWD EX Premium
Country flag
Charging station near Cumbres & Toltec railroad station in Chama looks like it is ready to go. I hope the local electric coop is up to the task of supplying reliable power. Friends in the area have gone mostly off grid because of multiple long power outages over the years

Cumbres & Toltec 2.jpg


Cumbres & Toltec1.jpg
 

manicsubmersion

Well-Known Member
First Name
Kevin
Joined
Jan 20, 2022
Threads
5
Messages
48
Reaction score
76
Location
New Mexico
Vehicles
2022 F150 hybrid Lariat, 2022 MachE AWD EX Premium
Country flag
Socorro is the first one that is coming online and it helps fill in the Electrify America gap between ABQ and El Paso or Deming.
Socorro DCFC has now been operational for about 6 months 62.5kw. I have used it several times
Ford Mustang Mach-E New Mexico Building Statewide EV Chargers Socorro_DC
Sponsored

 
 




Top