Billyk24
Well-Known Member
- First Name
- William
- Joined
- Nov 29, 2019
- Threads
- 88
- Messages
- 1,582
- Reaction score
- 794
- Location
- PA
- Vehicles
- Ford C-Max Energi, Premium Mach-E ordered
- Thread starter
- #1
Tesla supercharging rate per kWh is 0.28 cents. Idle fee of 50 cents a minute after "fill-up" but "1.00 per minute" if all the Tesla charging stations are full. This means a 60kW "fill-up" costs $16.80 at the Tesla Supercharger network while the Electify America network cost $1.00 entry fee plus (150kWh charger rate) 24 minutes at 0.99 cents equals $23.76 plus the $1 entry fee so the total is $24.76 for 60kW fill-up. If the EA charging rate is only 125kWh then 48 minutes at 0.69 cents is $33.12 plus the $1 entry fee for a total of $34.12 for 60KW of energy. More than double the Tesla Supercharging cost at 125kWh rate! California just mandate charging by the KW usage and not per minute. Will this creep into a national wide mandate?
Sponsored