I feel your pain! my 5/31/21 order was converted to a 2022 and is currently scheduled for the week of 1/17, though that will most likely change. All "left over" 21 orders that were changed to 22 model year cars are first to be built or so I have been told and scheduling for all the rest of the 22 MY cars will happen after those are built/scheduled.So there was no scheduling this week (11/8) due to Veteran's Day, none next week (11/15) for some obscure reason, and then none the week after (11/22) due to Thanksgiving. So when oh when are we going to get some scheduling done for 2022s?
With the current lack of materials/chips and MY21 cars being pushed back later and later, i'm pretty sure my car wont be built before February at best ?