2024 Mach-E Scheduling This Week (8/22/24) for Production Weeks 9/30 - 10/28

Newface

Member
Joined
Mar 6, 2023
Threads
22
Messages
22
Reaction score
14
Location
USANDA
Vehicles
Lotsudem
Country flag
Notes:
• Production weeks: 9/30 - 10/28.
• Main Commit.

Limited Availability:
- K1R/K1S - Mustang Mach-E Select RWD/AWD
- K4S - Mustang Mach-E GT eAWD

Exhausted Availability:
- 90D - Extended Range Battery
- K3R/K3S - Mustang Mach-E Premium RWD/AWD

Ford Mustang Mach-E 2024 Mach-E Scheduling This Week (8/22/24) for Production Weeks 9/30 - 10/28 US Ford Scheduling Notes - 8.19.24-1


Ford Mustang Mach-E 2024 Mach-E Scheduling This Week (8/22/24) for Production Weeks 9/30 - 10/28 US Ford Scheduling Notes - 8.19.24-2


Ford Mustang Mach-E 2024 Mach-E Scheduling This Week (8/22/24) for Production Weeks 9/30 - 10/28 US Ford Scheduling Notes - 8.19.24-3
Sponsored

 

VaporTrails

Well-Known Member
First Name
Steve
Joined
Nov 25, 2022
Threads
2
Messages
394
Reaction score
561
Location
Southeast US
Vehicles
2023 MME GTPE Vapor Blue, 1995 Acura Integra GS-R
Country flag
Do I have to look into the pen without sunglasses now? #MenInBlack

The “Exhausted Availability “ and the timing could lead one to think that a Model year shift is coming.
 

McSquashy

Well-Known Member
First Name
Josh
Joined
Mar 7, 2024
Threads
33
Messages
600
Reaction score
658
Location
Massachusetts
Vehicles
2023 Mach-E Premium 4X ER Vapor Blue
Country flag
“Exhausted Availability “ and the timing could lead one to think that a Model year shift is coming.
My thoughts exactly.

Please correct me if I'm wrong, but does this mean that the entire job to production run is 9/30 - 10/28?

Edit: not job to, job 2 ?‍♂
 
Last edited:

VaporTrails

Well-Known Member
First Name
Steve
Joined
Nov 25, 2022
Threads
2
Messages
394
Reaction score
561
Location
Southeast US
Vehicles
2023 MME GTPE Vapor Blue, 1995 Acura Integra GS-R
Country flag
I can only offer that my 2023 GTPE was in the 10/19/2022 production run. #512 off the assembly line. I got the key on 11/28/2022.
 

dcbr

Well-Known Member
First Name
don
Joined
Dec 18, 2021
Threads
9
Messages
58
Reaction score
37
Location
S.W. Michigan 49008
Vehicles
Subaru outback, 2021 Mach-E (sold) 2024 Mach- E Premium ER RWD
Occupation
retired
Country flag
I have ordered a 2024 Premium RWD Ext bat. I received an email that my Mach -e has a beginning production date the week of 9/30 2024. Now I notice that the Production weeks: 9/30 - 10/28 state: "Exhausted availability - 90D Extended Range battery" . Does this mean no cars with extended batteries will be built during this production period, or does it mean they will be exhausted during this period? If it is the latter, I have some hope my car will be built. If the former, not so much.
Sponsored

 
 







Top