Via Plugshare report(s), ( Meijer Howard (Coming Soon) | Green Bay, WI | EV Station (plugshare.com) ) the sad story of this station is due to an outside contractor that EA hired to finalize the work. The power company-Wisconsin Public Service (WPS) stated they are on stand-by ready to energize this location once these contractors finalize their work. WPS stated these contractors are out of state and won't return to this location for two weeks! Those Tesla adaptors can not arrive soon enough.