Thanks that was a good idea. Looks like the build group 5559 was building around 5-19. I think that means it still had the old HVBJB?Well, I don't have my MME yet but I've been hanging around this Forum for most of the 32 weeks I've been waiting to be scheduled. Folks have said the build date is on the door pillar label. (Also, "invoice date" near bottom left center of window sticker is approximate date of when the window sticker was issued (about 4-10 days before the build date. Caveat: due to a variety of factors, some cars are not built/completed for quite a while after their "build date".) Last 5 digits of VIN could be connected to batch numbers (also listed on window sticker) on this forum and the "build week" that the batch was scheduled to be assembled. Again, some MME have been delayed. If you have access to MME on dealer lot, have them show you the door label.
MAY THE FORD BE WITH YOU
![]()
The window sticker I thought had the expected build date but I thought they didn’t update if it slipped?Don’t you have access to the window sticker? It should be on there.
Or if you're at the lot, open the drivers door and look at the build date on the label inside.Looking at a car on a dealers lot and wondering how I can tell the build date?
It does.Looks like 5-19 wonder if that means the old HVBJB…