ADOT News

BMT1071

Well-Known Member
First Name
Mike
Joined
Mar 21, 2021
Threads
61
Messages
3,103
Reaction score
4,256
Location
Glendale, AZ
Vehicles
21 MME SR RWD, 23 MME GTPE
Occupation
Machine Control Specialist
Country flag
Facilities planned along interstates are step toward statewide network
Having trouble viewing this email? https://content.govdelivery.com/accounts/AZDOT/bulletins/3866430


Bookmark and Share

ADOT seeks bids to construct 21 electric vehicle charging stations
Facilities planned along interstates are step toward statewide network
PHOENIX – Advancing plans to support adoption of electric vehicles, the Arizona Department of Transportation is seeking bids for private entities to build or upgrade electric vehicle charging stations along interstate highways.

The stations are the first major step in establishing a statewide network of rapid charging stations, with 21 facilities expected to be operating by the end of 2025. These stations are intended to reduce range anxiety and encourage use of electric vehicles as a viable alternative to gasoline-powered vehicles.

All stations will be privately owned and operated, with federal funds covering 80% of construction costs and the private developer paying 20%. No state funds will be involved in the construction of these stations. Bids are due April 19, with ADOT awarding contracts this summer. Construction of the privately owned facilities is anticipated to take about a year.

The charging stations are funded through the National Electric Vehicle Infrastructure program, or NEVI, which is allocating $5 billion in funds nationwide through the U.S. Departments of Transportation and Energy and $76.5 million for Arizona.

The charging stations generally will be spaced no more than 50 miles apart, and must be constructed beyond the freeway within a mile of an interchange. The bidding process outlines general areas where stations eligible for funding can be located, with specific locations to be determined through the selection process. Each station must include at least four chargers that can charge a typical electric vehicle within 20-30 minutes.

While the first round of electric vehicle charging stations will focus on interstates, ADOT plans to expand onto other highways starting with an additional round of bids in 2025. The plans will evolve based on developments within the electric vehicle industry and by studying the usage patterns of the first set of stations that come online.

For more information about the electric vehicle charging station network, visit AZDOT.gov/EVPlan.

To plan your trip, get travel times or see ADOT cameras, download the AZ 511 app.

Visit us on social media on Facebook, Twitter, YouTube, Flickr or the ADOT blog.

SUBSCRIBER SERVICES:
Manage Preferences | Delete Profile | Help

Civil Rights/ADA | Derechos Civiles/ADA

For more information, visit azdot.gov



Sent on behalf of ADOT using GovDelivery Communications Cloud • 206 S. 17th Ave • Phoenix, AZ 85007 • 602.712.7355GovDelivery logo
Sponsored

 

AZBill

Well-Known Member
First Name
Bill
Joined
May 26, 2021
Threads
12
Messages
1,507
Reaction score
1,774
Location
Arizona
Vehicles
Rivian R1T, Hummer EV SUT, MME CA Route 1
Occupation
Engineer
Country flag
GM, EVGO and Pilot/Flying J are likely to have 9 new sites open in AZ by the end of this year. Winslow is already open and they have a contractor that is getting sites built and opened in short order. They are doing this without much NEVI funding.
Sponsored

 
 




Top