Gunrunner
Active Member
- First Name
- David
- Joined
- Jan 12, 2022
- Threads
- 9
- Messages
- 30
- Reaction score
- 13
- Location
- Wisconsin
- Vehicles
- 2015 Mustang GT and 2022 Mustang Mach E Premium
- Occupation
- Technology
- Thread starter
- #1
Just under two weeks ago my order changed from "Order confirmed" to "In Production" with an email from ford saying it was going to be built in the next few days. Wondering how long is a typical weight once they have moved you to "In Production" until the car is actually changed to "Built"? I had assumed two weeks would be ample time and it would change to Built and hopefully shipped.
It should be noted that my dealer assisted me in changing my 2022 Mach E Premium Extended Range AWD order to include a park assist kit and summer tires to facilitate it going into production. This worked great but now here I sit.
What are people seeing and what should I expect?
It should be noted that my dealer assisted me in changing my 2022 Mach E Premium Extended Range AWD order to include a park assist kit and summer tires to facilitate it going into production. This worked great but now here I sit.
What are people seeing and what should I expect?
Sponsored