Wisconsin phase 1 EV sites

OP
OP
Pibbman

Pibbman

Well-Known Member
First Name
Matthew
Joined
Jun 22, 2021
Threads
10
Messages
197
Reaction score
301
Location
Wi
Vehicles
Mach-E Premium AWD ER
Occupation
Software Engineer
Country flag
And here they are on a map:

WEVI-round1-RFP-awarded-locations-map.webp


Glad to see the ones in northern WI especially. Still some gaps though.
Let’s hope more will appear in round 2. I am a bit surprised by how much money is going into each site though. Who would have figured over 500k.

I wish I knew about this site sooner. I hope they are considering installing these chargers in a drive thru format rather than a parking space format

It looks like others brought it up…

Ford Mustang Mach-E Wisconsin phase 1 EV sites 1716727142822-
 
Last edited:

dbeth

Well-Known Member
Joined
Nov 11, 2021
Threads
4
Messages
81
Reaction score
101
Location
S. Central WI
Vehicles
2024 Mustang Mach-E GT
Occupation
HS teacher
Country flag
Good to see a start....now we just have to start digging sooner rather than later.
 

Billyk24

Well-Known Member
First Name
William
Joined
Nov 29, 2019
Threads
116
Messages
2,317
Reaction score
1,302
Location
PA
Vehicles
Ford C-Max Energi, Premium Mach-E ordered
Country flag
Report on Plugshare indicating the Kwik Trip location in Ashland has just opened. Other locations? Maybe Spring 2025.
 


Billyk24

Well-Known Member
First Name
William
Joined
Nov 29, 2019
Threads
116
Messages
2,317
Reaction score
1,302
Location
PA
Vehicles
Ford C-Max Energi, Premium Mach-E ordered
Country flag
Report on Plugshare indicating the Kwik Trip location in Ashland has just opened. Other locations? Maybe Spring 2025.
photo is from Plugshare and from the Ashland, Wisconsin Kwik Trip location.
Ford Mustang Mach-E Wisconsin phase 1 EV sites kwik trip ashland ev chargers
 

Billyk24

Well-Known Member
First Name
William
Joined
Nov 29, 2019
Threads
116
Messages
2,317
Reaction score
1,302
Location
PA
Vehicles
Ford C-Max Energi, Premium Mach-E ordered
Country flag
The new Kwik Trip EV charging station in New Salem (from Plugshare again) which is off I-90 near the Minnesota border. Again we have the pull thru type of station layout.
Ford Mustang Mach-E Wisconsin phase 1 EV sites Kwik Trip new Salem off I-90
 

Ridge_Racer

Member
First Name
Wole
Joined
Nov 13, 2024
Threads
0
Messages
24
Reaction score
26
Location
Texas
Vehicles
2024 Mach-e premium RWD ext. bat.
Occupation
healthcare
photo is from Plugshare and from the Ashland, Wisconsin Kwik Trip location.
kwik trip ashland ev chargers.jpg
I don’t understand this charging setup. How are you supposed to 4 cars at those stations.
 

Tampamike

Well-Known Member
First Name
Mike
Joined
Feb 19, 2021
Threads
24
Messages
2,071
Reaction score
2,808
Location
Tampa, FL
Vehicles
‘24 Mach E Premium RWD
Country flag
I don’t understand this charging setup. How are you supposed to 4 cars at those stations.
Is it because each unit can only charge one car even though it has two cords - like the EA units? There’s actually four cabinets there if you look close - two more in the background.
 

dbeth

Well-Known Member
Joined
Nov 11, 2021
Threads
4
Messages
81
Reaction score
101
Location
S. Central WI
Vehicles
2024 Mustang Mach-E GT
Occupation
HS teacher
Country flag
There are 4 cabinets there; front and back. One car pulls in on one side, the other pulls in on the other. Another pair is behind the truck.
 

Peugfan

Well-Known Member
Joined
Jan 26, 2021
Threads
1
Messages
219
Reaction score
231
Location
Minnesota
Vehicles
2017 Linc MKX, 2021 MME Prem 4EX Infinite Blue
Country flag
Just a further update on Kwik Trip EV chargers In Wisconsin. Menominee and Chippewa Falls sites are now open. Charge stations have CCS1 connector on one side and NACS connector on the other side. Reported to charge at up to 195 kw rate, Rivian and to 150 minimum in any position. Long hoses support using either connector from any position. West Salem site even has covered sites just like gas pumps have…just what is needed for northern sites!
 

Billyk24

Well-Known Member
First Name
William
Joined
Nov 29, 2019
Threads
116
Messages
2,317
Reaction score
1,302
Location
PA
Vehicles
Ford C-Max Energi, Premium Mach-E ordered
Country flag
Some of these "Phase 1" stations have had zero done in the past 20 months. Mercer, WI on hwy 51 is one of them. About 20 miles south a new Kwik Trip location has been identified for a new installation. I bet Kwik Trip opens before the Shell/Family Market in Mercer.
 

Billyk24

Well-Known Member
First Name
William
Joined
Nov 29, 2019
Threads
116
Messages
2,317
Reaction score
1,302
Location
PA
Vehicles
Ford C-Max Energi, Premium Mach-E ordered
Country flag
Let’s hope more will appear in round 2. I am a bit surprised by how much money is going into each site though. Who would have figured over 500k.

I wish I knew about this site sooner. I hope they are considering installing these chargers in a drive thru format rather than a parking space format

It looks like others brought it up…

1716727142822-wp.webp
In the northern portion of Wisconsin there are some real duds with this nevi program: Stowes Family Market at Mercer Rt51 about 18 miles south of Ironwood, Michigan--Korner Stores Minong rt 53 and Korner Store Armstrong Creek rt 8 have shown zero progress in the past 18 months. There is a large "hole" for DCFC charging north of WI 70, west of WI 13 and south of WI 2. Essentially the northwest portion of the state including Hayward which has a large tourism attraction.
Sponsored

 
 







Top