DadzBoyz
Well-Known Member
- First Name
- Dan
- Joined
- Jun 6, 2022
- Threads
- 53
- Messages
- 743
- Reaction score
- 807
- Location
- Oldsmar, FL
- Vehicles
- 22 Mustang Mach-E GTPE (ordered), 20 Mazda CX-5
- Occupation
- Software Systems Integrator
- Thread starter
- #1
Please do not complete this poll until after 8/15/2022 scheduling release on 8/18/2022 or after.
This poll is a follow-up to the 8/15 Mach-E Scheduling "Priority Code" Poll .
We want to find out if those that had a "Priority Code" update were scheduled for a 2022 build during these last week(s) of 2022 Build Scheduling..
Again, a theory is that this weeks scheduling (8/15/2022) may be the last major scheduling of 2022 model year builds and the following weeks would be "Clean-Up" scheduling 2022's.
This poll is a follow-up to the 8/15 Mach-E Scheduling "Priority Code" Poll .
We want to find out if those that had a "Priority Code" update were scheduled for a 2022 build during these last week(s) of 2022 Build Scheduling..
Again, a theory is that this weeks scheduling (8/15/2022) may be the last major scheduling of 2022 model year builds and the following weeks would be "Clean-Up" scheduling 2022's.
Sponsored