Hi guys, first post so please bear with me. I did a preorder for the Select back on 9/27 and I’d like for you all to keep it real with me in terms of how long it’ll take to receive. I preordered in person at the dealership & I was told I can expect the Select in 4-5 months. Now after reading through some posts on this forum, I’m convinced I was lied to. Is my car really going to take 30-38 weeks (7-9 months!) or should I just get my $500 back and get a Tesla lol.

Thanks
Sponsored

 

MachEMaster

Well-Known Member
First Name
Will
Joined
Jan 25, 2022
Threads
27
Messages
1,052
Reaction score
1,212
Location
Canada
Vehicles
1997 GMC Yukon GT
Occupation
Aircraft Maintenance Engineer
Country flag
Hi guys, first post so please bear with me. I did a preorder for the Select back on 9/27 and I’d like for you all to keep it real with me in terms of how long it’ll take to receive. I preordered in person at the dealership & I was told I can expect the Select in 4-5 months. Now after reading through some posts on this forum, I’m convinced I was lied to. Is my car really going to take 30-38 weeks (7-9 months!) or should I just get my $500 back and get a Tesla lol.

Thanks
I got my Select AWD in 5 months, even enduring a 3 week “Parts Shortage” that slowed the Production to Build date. Or you could be like everyone else and get a White Tesla! Lol
 

ctenidae

Well-Known Member
First Name
Alex
Joined
Jan 19, 2022
Threads
37
Messages
1,403
Reaction score
1,852
Location
Stamford, CT
Vehicles
DMG GT; Taycan, Q7, Sienna Hybrid
Occupation
Solver of problems
Country flag
Don't get a Tesla. Their forum complaints are much more cultish, and not nearly as entertaining. At least here it's OK to make fun of our cars/Ford/each other. Very little is sacrosanct.

It is possible you'll get your car in 4-5 months. Maybe not probable, but certainly possible.
 

shanky2008

Well-Known Member
Joined
Sep 7, 2022
Threads
1
Messages
74
Reaction score
44
Location
Texas
Vehicles
Ordered 2023 Mustand Mach E
Occupation
Devops Engineer
The next Scheduling for Mach E is on 10/20 , I would suggest wait till that to see if you get scheduled for a build date.
 

jay1122

Well-Known Member
First Name
jay
Joined
Apr 11, 2022
Threads
1
Messages
380
Reaction score
338
Location
NJ
Vehicles
2021 Mustang Mach E select AWD
Country flag
M3P and MYP is available for quick delivery. But that 60-70K price and minimalist(cheap ass) interior though. I can never get through those 2.
 

HuntingPudel

Well-Known Member
First Name
Steve
Joined
Mar 23, 2021
Threads
88
Messages
12,929
Reaction score
17,373
Location
Bay Area, CA
Vehicles
2024 MME GT with Performance Upgrade, 1979 Fire-Am, 1972 K/5 Blazer
Occupation
Engineering
Country flag
Don't get a Tesla. Their forum complaints are much more cultish, and not nearly as entertaining. At least here it's OK to make fun of our cars/Ford/each other. Very little is sacrosanct.

It is possible you'll get your car in 4-5 months. Maybe not probable, but certainly possible.
Besides, they don’t have a typing Poodle. ??

Depending on your chosen dealer’s allocation, it might be possible to get your car in 4-5 months. I think a realistic number is a month longer. ?‍♂?