6/27/22 Build Week Thread

junb1

Well-Known Member
First Name
Eufemio
Joined
Apr 26, 2022
Threads
1
Messages
55
Reaction score
62
Location
Vernon Hills IL
Vehicles
Tesla MYP, Volvo XC90
Country flag
Website finally says it’s built! Delivery date of 8/9-8/15, so hopefully not as many delays with that as the build process, lol. I never did receive a window sticker as some are saying they did here. Assuming that would be through email?
Congrats! What is your batch number?
Sponsored

 

Lcanderson

Active Member
First Name
Chris
Joined
Oct 12, 2021
Threads
1
Messages
30
Reaction score
23
Location
Colorado Springs
Vehicles
Mach-e Premium ER AWD (Ordered)
Country flag
Interesting. I only have my original 8 digit order number. Guess I’ll have to wait for something from Ford on that. Thanks, though!
I ordered online and only had the 8-digit order number but was able to get the 4-digit one from my dealer.
 

LeWe

Well-Known Member
First Name
Will
Joined
Feb 22, 2022
Threads
5
Messages
136
Reaction score
124
Location
San Jose, CA
Vehicles
2022 Space White GT
Occupation
Software Engineer
Country flag
Website finally says it’s built! Delivery date of 8/9-8/15, so hopefully not as many delays with that as the build process, lol. I never did receive a window sticker as some are saying they did here. Assuming that would be through email?
I actually used these instructions to get my VIN from the regular order tracker at Ford.com:
https://seg.fyi/mache-vin/#/

Using the VIN, I checked for the window sticker manually daily by going to FordDirect. Example link:
https://www.windowsticker.forddirect.com/windowsticker.pdf?vin=3FMTK1RM3NMA31617

Obviously use your real VIN and you should be able to access your sticker a few days before it actually gets built.

On the window sticker you can get your 4-digit order number. Thanks to Av8tor for making the guide image here:
Ford Mustang Mach-E 6/27/22 Build Week Thread 1647004301049
 


nvabill

Well-Known Member
First Name
Bill
Joined
Jan 11, 2021
Threads
57
Messages
2,375
Reaction score
1,907
Location
Virginia Beach, Va.
Vehicles
F-150, '22 California Route 1
Country flag
Received window sticker yesterday (6/28) batch 6819 518/872.
Ford's reservation page still shows "Scheduled for Production / Week of 6/27/2022"
CR1 eAWD, Space White. Ordered: Nov 27.
Interesting I am 6819 526/872 ordered 11/11/21, CR1 eAWD Shadow Black.
 

TX_MME

Well-Known Member
First Name
Kyle
Joined
May 9, 2022
Threads
2
Messages
53
Reaction score
36
Location
Dallas, TX
Vehicles
MME GT DMG
Country flag
I actually used these instructions to get my VIN from the regular order tracker at Ford.com:
https://seg.fyi/mache-vin/#/

Using the VIN, I checked for the window sticker manually daily by going to FordDirect. Example link:
https://www.windowsticker.forddirect.com/windowsticker.pdf?vin=3FMTK1RM3NMA31617

Obviously use your real VIN and you should be able to access your sticker a few days before it actually gets built.

On the window sticker you can get your 4-digit order number. Thanks to Av8tor for making the guide image here:
1647004301049.png
Thanks!! I had my vin and was able to pull up the sticker with that link. Everything looks like it's in order. Looks like my batch number was 6711.
 

OrangeSilentStang

Active Member
First Name
Alex
Joined
Jun 21, 2022
Threads
0
Messages
37
Reaction score
56
Location
Overland Park, KS
Vehicles
2022 Mach e Premium AWD ER (On Order)
Country flag
So just a recap.
Our batch numbers are all 6711, 6739 and 6819
6711 batch is being built.
6739 got their window stickers last week but don't have built notifications or modules? I didn't see an update.
6819 got window stickers on Monday. No modules yet.

Cool!
 

nvabill

Well-Known Member
First Name
Bill
Joined
Jan 11, 2021
Threads
57
Messages
2,375
Reaction score
1,907
Location
Virginia Beach, Va.
Vehicles
F-150, '22 California Route 1
Country flag
So just a recap.
Our batch numbers are all 6711, 6739 and 6819
6711 batch is being built.
6739 got their window stickers last week but don't have built notifications or modules? I didn't see an update.
6819 got window stickers on Monday. No modules yet.

Cool!
Seems about right.
 

USC

Well-Known Member
First Name
USC
Joined
Mar 11, 2022
Threads
0
Messages
68
Reaction score
32
Location
CA
Vehicles
MACHE
Country flag
So just a recap.
Our batch numbers are all 6711, 6739 and 6819
6711 batch is being built.
6739 got their window stickers last week but don't have built notifications or modules? I didn't see an update.
6819 got window stickers on Monday. No modules yet.

Cool!
I am 6739 148/600 got module this morning
 

OrangeSilentStang

Active Member
First Name
Alex
Joined
Jun 21, 2022
Threads
0
Messages
37
Reaction score
56
Location
Overland Park, KS
Vehicles
2022 Mach e Premium AWD ER (On Order)
Country flag
I am 6739 148/600 got module this morning
Well then, there we go. So 6739 is being built today and is only 600 in the batch. We may be seeing 6819 tomorrow or, most likely, Friday. Mine is 57/872 in that batch, so I'll let you know when I get modules.
 

Ming

Well-Known Member
Joined
Oct 29, 2021
Threads
0
Messages
354
Reaction score
260
Location
Texas
Vehicles
2021 MME premium SR RWD; 2022 Civic; Tesla MYP
Country flag
Received window sticker yesterday (6/28) batch 6819 518/872.
Ford's reservation page still shows "Scheduled for Production / Week of 6/27/2022"
CR1 eAWD, Space White. Ordered: Nov 27.
interesting that my order has production week 7/4, but batch 6819 102/872. do they build cars in a batch out of order?
 

OrangeSilentStang

Active Member
First Name
Alex
Joined
Jun 21, 2022
Threads
0
Messages
37
Reaction score
56
Location
Overland Park, KS
Vehicles
2022 Mach e Premium AWD ER (On Order)
Country flag
interesting that my order has production week 7/4, but batch 6819 102/872. do they build cars in a batch out of order?
Lol at this point it would make sense with all these order dates being out of order. But we're probably looking at 6819 going on Friday or carrying over to next week. Who knows, maybe yours will start a few days early.
 

LeWe

Well-Known Member
First Name
Will
Joined
Feb 22, 2022
Threads
5
Messages
136
Reaction score
124
Location
San Jose, CA
Vehicles
2022 Space White GT
Occupation
Software Engineer
Country flag
interesting that my order has production week 7/4, but batch 6819 102/872. do they build cars in a batch out of order?
From what I remember from the other threads it looks like the cars are not necessarily built in batch order. That said, I do think there is some kind of spillover between cars scheduled later in 6/27 and earlier in 7/4.

I am suspecting that our batch 6819 is actually getting built around Friday/Saturday timeframe with some spilling into Monday.
 

USC

Well-Known Member
First Name
USC
Joined
Mar 11, 2022
Threads
0
Messages
68
Reaction score
32
Location
CA
Vehicles
MACHE
Country flag
 







Top