Build date

lwilliams0514

Well-Known Member
First Name
Lashawn
Joined
Sep 16, 2020
Threads
13
Messages
198
Reaction score
290
Location
Gardena, CA
Vehicles
2021 Ford Mustang Mach E Premium RWD
Occupation
Finance Manager
Country flag
Finally got a build date!

Ordered a Premium RWD ER (Changed from RT1 a few weeks ago) - Carbonized Gray

Ordered 7/1/2020

Order No. 10027726

Scheduled to be built the week of 01/18/2021

Dealer said it takes 1 - 2 weeks to build and then ships after that. I am in Southern California so it shouldn't take long to get here via rail.
Sponsored

 

Bari

Active Member
First Name
Jabari
Joined
Jun 27, 2020
Threads
1
Messages
32
Reaction score
45
Location
Miami, FL
Vehicles
2017 Ford Edge Sport
Occupation
Freight Train Engineer
Country flag
Finally got a build date!

Ordered a Premium RWD ER (Changed from RT1 a few weeks ago) - Carbonized Gray

Ordered 7/1/2020

Order No. 10027726

Scheduled to be built the week of 01/18/2021

Dealer said it takes 1 - 2 weeks to build and then ships after that. I am in Southern California so it shouldn't take long to get here via rail.
So did I! February 1st Premium AWD ER
 

TheVirtualTim

Well-Known Member
First Name
Tim
Joined
Oct 11, 2020
Threads
26
Messages
1,215
Reaction score
2,196
Location
Dearborn, MI
Vehicles
Mach-E First Edition, Escape Hybrid
Country flag
You should get an email from Ford (not the dealer). My email had a subject line "Your 2021 Mustang Mach-E order".

The first few words were "Your vehicle has been scheduled for production" and it goes on to tell you your build WEEK (but not the day).

If you contact your dealer, they can pull up your order and give you your VIN and should also be able to tell you specifically which day of the week your car is scheduled for build. (My car just happens to be scheduled for build on Monday so my "build week" and "build day" are the same.)

I only have my VIN and build date (specific date ... not just the week) because I contacted my dealer ... I don't think you'll ever receive an email from Ford with that info.



ALSO ... if there is anything you want to change on a car, you can usually do it UP UNTIL the car is scheduled for build. Once it's scheduled for build, the plant locks out changes because *some* changes can force them to build cars in a different order (and this screws up the schedule).

I'll give you an example. My dealer forgot to add the Interior Protection Package (Option 17P) on my order (these are winter floor mats and a cargo mat). In reality, when you order things like floor mats, the factory doesn't "install" them... they just toss a box in the back of the car when it gets to the end of the assembly line. I asked my dealer if I can get those added but because my car is already scheduled for build, all changes are locked out -- even floor mats can't be added. I'll be ordering those via the parts department (no big deal).

So if there's anything you wanted that you didn't get when you placed the order (e.g. want to finance in the cost of a Ford Connected Charger with your car ... which wasn't available when you originally placed the order?) you can *probably* do that as long as your car is not yet scheduled for build.
 


Maric

Well-Known Member
Joined
Jun 10, 2020
Threads
20
Messages
887
Reaction score
2,219
Location
NorCal
Vehicles
Grabber Blue FE
Occupation
Engineer
Country flag
Well coincidentally received an email from Dealership.

My Mach Drop Grabber Blue FE is scheduled for production Jan. 4th 2021. He didn't provide a VIN but I asked him if he can provide it to me.
 

JayLove

Member
First Name
Jay
Joined
Jul 13, 2020
Threads
0
Messages
19
Reaction score
24
Location
Baton Rouge, LA
Vehicles
'21 MME Prem AWD Ext, '13 Explorer XLT,
Country flag
I got the email too!
Reserved/Order date 7/3/20, number in the 82 thousands
Build date week of Jan 18
Premium ER AWD
Infinite Blue
Heading to Baton Rouge
 

MrsLofgreen

Active Member
First Name
Shawnacy
Joined
Nov 5, 2020
Threads
0
Messages
39
Reaction score
31
Location
Gilbert, AZ
Vehicles
Ford Mustang Mach-E
Country flag
Adding mine to the thread
Ordered 7.10 11,000+ group
Build Date Week of 1.18.21
No Prior Reservation
Premium ER AWD
Infinite Blue
Phoenix, AZ Metro
 
Last edited:
OP
OP

JoelOclock

Well-Known Member
First Name
Joel
Joined
Mar 7, 2020
Threads
15
Messages
197
Reaction score
185
Location
Seattle
Vehicles
Mustang Mach E Premium ER AWD
Country flag
Adding mine to the thread
Ordered 7.10 11,000+ group
No Prior Reservation
Premium ER AWD
Infinite Blue
Phoenix, AZ Metro
You didn’t say the build date
 

GoGoGadgetMachE

Well-Known Member
First Name
Michael
Joined
Jan 23, 2020
Threads
153
Messages
5,614
Reaction score
12,655
Location
Ohio
Vehicles
2021 Mach-E 1st Ed., 2022 Lightning Platinum
Occupation
Professional forum cheerleader and fanboy
Country flag
Probably because you’re in Canada. Was pretty shocked to see a fellow Brit in the UK got a build date
yeah, they haven't processed a lot of the Metric cars yet. Only the Freedom Unit cars. (*)

(*) this is not true
 

SnBGC

Well-Known Member
First Name
Greg
Joined
Apr 20, 2020
Threads
46
Messages
5,957
Reaction score
9,754
Location
Phoenix
Vehicles
2021 Mach-E FE, 2021 Wrangler 4xe High Altitude
Occupation
Manager
Country flag
Adding mine to the thread
Ordered 7.10 11,000+ group
No Prior Reservation
Premium ER AWD
Infinite Blue
Phoenix, AZ Metro
San Tan Ford?
 

Florida7382

Well-Known Member
Joined
Jan 11, 2020
Threads
6
Messages
71
Reaction score
61
Location
Florida
Vehicles
Mustang
Got one too. Premium ER. Where does this put my delivery realistically? I’m really close to canceling if someone is in need of one in SW Florida.

Your vehicle is scheduled to be built the week of January 25 2021.
 

JellyBelly

Well-Known Member
First Name
Kris
Joined
Jun 27, 2020
Threads
14
Messages
2,488
Reaction score
1,939
Location
San Diego
Vehicles
MME RR FE
Country flag
Got one too. Premium ER. Where does this put my delivery realistically? I’m really close to canceling if someone is in need of one in SW Florida.

Your vehicle is scheduled to be built the week of January 25 2021.
I dont think if you cancel you can transfer it to some one specific. It goes to dealer I think.
 
OP
OP

JoelOclock

Well-Known Member
First Name
Joel
Joined
Mar 7, 2020
Threads
15
Messages
197
Reaction score
185
Location
Seattle
Vehicles
Mustang Mach E Premium ER AWD
Country flag
Got one too. Premium ER. Where does this put my delivery realistically? I’m really close to canceling if someone is in need of one in SW Florida.

Your vehicle is scheduled to be built the week of January 25 2021.
I’d expect it before end of Feb.
3.5weeks to build, QA, ship. Just a conservative guess though. Minimum has to be around 2 weeks I’d have thought. @trutolife27 sound right?
Sponsored

 
 




Top