OttawaGuy
Well-Known Member
- Joined
- Nov 15, 2020
- Threads
- 27
- Messages
- 647
- Reaction score
- 810
- Location
- Gatineau, Canada
- Vehicles
- Mach E RWD SR, F150 XLT Special Edition
- Occupation
- Busy!
- Thread starter
- #16
There are some 100kW Chargers
Sponsored
Yes it does, just that there are not many Electrify Canada charge stations yet :\Does anyone know if the Ford pass works with electrify Canada? Also, what about the free 250kwh they get in the US? My dealer said no, but hey they don’t give much confidence with any questions since they haven’t had one yet.
Yes there are plenty on the CIrcuit Electrique. They are not very well advertised. I know of at least 2 that I used and worked very well with my MME. I didn't stay at the charge station once plugged, but when I plugged them at the 100 kw stations, it would start at about 64 then climbed to 74 then I just walked away to grab food... by the time I came back and ate, my car was at 80% and I stopped the charge.Do you guys know if there are any 100+kw chargers in quebec. I didnt realize that here in QC the fast chargers are 50kw chargers
Any of them along the 50 or 417/40Yes there are plenty on the CIrcuit Electrique. They are not very well advertised. I know of at least 2 that I used and worked very well with my MME. I didn't stay at the charge station once plugged, but when I plugged them at the 100 kw stations, it would start at about 64 then climbed to 74 then I just walked away to grab food... by the time I came back and ate, my car was at 80% and I stopped the charge.
nvm just checked there's only one in Grenville. 1 only youd figure wed have a more developped circuit on those routes.Yes there are plenty on the CIrcuit Electrique. They are not very well advertised. I know of at least 2 that I used and worked very well with my MME. I didn't stay at the charge station once plugged, but when I plugged them at the 100 kw stations, it would start at about 64 then climbed to 74 then I just walked away to grab food... by the time I came back and ate, my car was at 80% and I stopped the charge.
It's a question of time I suppose.. I mean, before this year, not many cars actually were able to charge above 50 kw/h. With all the new EVs coming out, pretty sure they are mostly going to add only 100kw/h+ stations over time and higher.nvm just checked there's only one in Grenville. 1 only youd figure wed have a more developped circuit on those routes.
I didn't really go on the 417, I'm in Quebec. I did go on the 50 to go towards Parc Omega with the kids in February, but I didn't stop to charge. I had looked and saw some charging stations at Montebello, but I didn't take a look to see if they were 50 or 100.Any of them along the 50 or 417/40
It does in Ottawa, but the app shows the ottawa chargers, and Im planning a trip to NS and it shows the partner chargers there also. Ill need to check if those are 50 or 100+I didn't really go on the 417, I'm in Quebec. I did go on the 50 to go towards Parc Omega with the kids in February, but I didn't stop to charge. I had looked and saw some charging stations at Montebello, but I didn't take a look to see if they were 50 or 100.
I don't even know if Circuit Electrique goes into Ontario or not with a different name or not
I know on the 40 East you'll have some 100. I'm on some Quebec MME Forums / Facebook Groups and lots of people talk about charging between Montreal - Quebec... However, past Quebec towards NS, I wouldn't know what the infrastructure looks like. I think Petro Canada was supposed to build a coast-to-coast network, but not sure if it was done.It does in Ottawa, but the app shows the ottawa chargers, and Im planning a trip to NS and it shows the partner chargers there also. Ill need to check if those are 50 or 100+
The petro cans (electrify Canada) are the fastest 350 KW one in Montreal a couple in Quebec. Electric Circuit I think are upgrading a few to 150 KW? But ya 50 KW is most.Do you guys know if there are any 100+kw chargers in quebec. I didnt realize that here in QC the fast chargers are 50kw chargers
So basically I have to get a card for CE and EC? Plug and Charge doesnt work with either of them right.The petro cans (electrify Canada) are the fastest 350 KW one in Montreal a couple in Quebec. Electric Circuit I think are upgrading a few to 150 KW? But ya 50 KW is most.
The petro Canada ones are also the cheapest. I think in the 33cent per min range for up to 350The petro cans (electrify Canada) are the fastest 350 KW one in Montreal a couple in Quebec. Electric Circuit I think are upgrading a few to 150 KW? But ya 50 KW is most.
Yes we do not have much network on fords network up here. I have EC and IVY. CE are few and far between.So basically I have to get a card for CE and EC? Plug and Charge doesnt work with either of them right.