There seems to be no criteria that I have been able to see as to what causes Ford to issue a build date for an order. It sure isn't FIFO. Has anyone else figured out what triggers Ford to select an order for build, kinda looks like a lottery draw.
We had long discussions of this when the first build schedules came out. It has probably changed since the start but seemed to involve optimizing the line speed by varying car configurations, destination so they could fill autoracks or trains to given destinations, and a bias to early orders and First Editions, with the FE builds finishing with Mach Drops scheduled for the week of January 4. I haven't looked into it since the early batch of schedules. However, we are sure it is not only FIFO.
Sponsored

 

Illinibird

Well-Known Member
First Name
Mike
Joined
Oct 13, 2020
Threads
40
Messages
1,563
Reaction score
1,445
Location
Frankfort Illinois
Vehicles
2015 Acura MDX Adv; 2016 Titanium Fusion Hybrid
Occupation
retired Endodontist (root canal specialist) and Clinical Assistant Professor
Country flag
There seems to be no criteria that I have been able to see as to what causes Ford to issue a build date for an order. It sure isn't FIFO. Has anyone else figured out what triggers Ford to select an order for build, kinda looks like a lottery draw.
I agree with you there. I ordered October 12, 2020 and I see that an order for November has already been scheduled in March 2021. It is very frustrating to say the least.
 

Garbone

Well-Known Member
First Name
Gary
Joined
Dec 16, 2020
Threads
31
Messages
1,202
Reaction score
1,666
Location
Florida
Vehicles
21 Mach E , 22 MachE, 62 C10 Big window long bed
Occupation
Loafer
Country flag

OttawaGuy

Well-Known Member
Joined
Nov 15, 2020
Threads
27
Messages
647
Reaction score
810
Location
Gatineau, Canada
Vehicles
Mach E RWD SR, F150 XLT Special Edition
Occupation
Busy!
Country flag
Is "confirmed" accepted by dealer?
I had made the order directly at the dealer on Nov 17 and made a deposit


He sent it off to Ford and her told me on the 18th that he had recieved confirmation by Ford that my order was accepted
 
Last edited:


phidauex

Well-Known Member
First Name
Sam
Joined
Dec 8, 2020
Threads
15
Messages
840
Reaction score
1,545
Location
Colorado
Vehicles
2021 MachE 4EX, 2006 Prius, 1997 Tacoma
Occupation
Renewable Energy Engineer
Country flag
There seems to be no criteria that I have been able to see as to what causes Ford to issue a build date for an order. It sure isn't FIFO. Has anyone else figured out what triggers Ford to select an order for build, kinda looks like a lottery draw.
Yeah, I did a quick correlation analysis against Location, Order Date, Model, Color, etc., and after you account for the fact that many early orders occurred before manufacturing even began, there is no clear link between any of the options and your build date. The only curious outliers are the two fastest Order -> Build Date records, both of which are Non-US (One UK, one Canada), so perhaps those markets were allocated earlier build queues. But even that is still speculative - two points make a line, but I need three points for a trend. ;)
 

stesir

Well-Known Member
First Name
Steinar
Joined
Jan 8, 2021
Threads
2
Messages
623
Reaction score
663
Location
Norway
Vehicles
RR Mach-E4X, W Mondeo ST AWD
Occupation
Senior Enginer Telecom/development
Country flag
Welcome to the Mach E Forum Submitted Orders List. And congrats to all the future owners on the list!

This list is for ACCEPTED ORDERS ONLY (reservations which have been converted to accepted orders).

1. Please use the Order Submission Form to add yourself to the list.
2. Post a reply in this thread to let us know.
3. Once your submission is approved it will show up in the list.
4. Be sure to check out the STATS sheet below for detailed infographics on take rates for model/trim, colors, drivetrain and battery.
5. Use the Change Request Form to request any changes to your order info in the tracker.

The more crowdsourced data we have, the more helpful it will be for everyone to track the progress of their orders as we move towards the first deliveries!


registered ! ;-)
 

FirstBEV

Active Member
First Name
Matt
Joined
Jan 19, 2021
Threads
2
Messages
26
Reaction score
44
Location
Chicago
Vehicles
Ford Focus, ordered Mustang Mach-E
Country flag
I agree with you there. I ordered October 12, 2020 and I see that an order for November has already been scheduled in March 2021. It is very frustrating to say the least.
There’s an order from the end of December with a build date in February and and order from January with a build date of March. It’s very frustrating that some people get an immediate build date and others wait for months with no build date assigned.

5662A32E-85EA-442A-A662-913F4714362F.jpeg
 

Larry

Well-Known Member
First Name
Larry
Joined
Jan 29, 2021
Threads
6
Messages
257
Reaction score
242
Location
Pennsylvania
Vehicles
Ranger and Mach-E
Occupation
Retired
Country flag
There’s an order from the end of December with a build date in February and and order from January with a build date of March. It’s very frustrating that some people get an immediate build date and others wait for months with no build date assigned.

Ford Mustang Mach-E Submitted Orders Tracking List and Stats [Enter Yours] 5662A32E-85EA-442A-A662-913F4714362F
Amen. My order just went in a couple weeks ago. So am I looking at a build date in a few more weeks or this summer? I’ll live with either but I’d sure like to know.
 

generaltso

Well-Known Member
Joined
Jun 24, 2020
Threads
69
Messages
14,706
Reaction score
26,803
Location
Vermont
Vehicles
2021 MME Premium AWD SR Infinite Blue
Country flag
There’s an order from the end of December with a build date in February and and order from January with a build date of March. It’s very frustrating that some people get an immediate build date and others wait for months with no build date assigned.
I'm not saying that's not the case, but you have to be careful with some of that data. Dealer's spew a lot of bogus information, and a lot of people have submitted the form with dates given to them by their dealer instead of official Ford communications.
 

gtin

Member
First Name
Gilberto
Joined
Feb 3, 2021
Threads
0
Messages
17
Reaction score
23
Location
Colorado
Vehicles
Mazda CX5, Mach-E AWD SR RR
Occupation
Senior Software Engineer
Country flag
I am in Colorado. Ordered a premium awd sr RR on 10/07/20, made a change in less than a week after ordering, dealer has a Ford receipt date of 10/12/2020. I still have not received a build date. I asked the dealer they said they have 18 orders without a build date. She also said there are 4 orders earlier than mine without a build date. She also said she has build dates for older orders through out February and she does not have any for March yet. Hopefully mine will get build on March or earlier April.
 

wings2063

Well-Known Member
First Name
Ron
Joined
Dec 29, 2020
Threads
10
Messages
135
Reaction score
118
Location
Dallas
Vehicles
EV6 GT-Line /Mache Premium 4x
Occupation
Retired
The other issue is out of the thousands of orders submitted this is only a little over 1% of the possible 50k build plan. Any errors in dates or dealer misinformation can really skew the small sample we have. However Ford customer service should show scheduled dates for everyone after 30 days if they plan on building the cars even if it is a 6 month moving target. IMHO