HayfieldDad
Member
- First Name
- Shane
- Joined
- Apr 16, 2025
- Threads
- 0
- Messages
- 7
- Reaction score
- 3
- Location
- Alexandria, VA
- Vehicles
- 2025 Ford Mustang Mach-e GT
What survey?It was quick, within a few days of me filling out the survey.
Sponsored
What survey?It was quick, within a few days of me filling out the survey.
You should get an email from Qmerit to start the process. The first step is filling out a survey about your home and electrical system, with pictures of the panel and install location. About 3 days later, an installer came out to take a few measurements and finalize the quote. Once you approve it, they schedule install.What survey?
2 days after purchase. I think it's highly dependent on how fast your dealer processes the paperwork.How long did it take to get the survey?
For me, the process took a while. The town wasn't very quick about it. I reached out to Qmerit right before the holidays (mid-December), the install was finished end of January, and final inspection done by mid-February.How long did it take to get the survey?