sockmeister
Well-Known Member
- Joined
- Sep 24, 2020
- Threads
- 6
- Messages
- 1,882
- Reaction score
- 2,996
- Location
- Pennsylvania
- Vehicles
- 2021 Mustang Mach-E4x
- Occupation
- SW Engineer
It was 2/10, ETA of 3/28.
This is interesting. Our "Ship Date" was 2/17 and it showed up as delivered to MUNCIE on Saturday, 3/6. So either our train passed yours, or this is evidence that the ship date is the date it was loaded onto a railcar and not the actual day the train left for the US. Then when the one long train then arrives in KS, it then takes several days to move the cars to the various next train yards for the next leg of their journey (which makes sense). Would be interesting to know the time frame between train departures (it is at least 7 days based on this info). Our ETA end date is 3/29.
No rhyme or reason to it, I guess. I shipped 2/16, but I have the same ETA as both of you.
Mine is currently sitting in KC.