How much longer

karthik

Active Member
First Name
karthik
Joined
May 27, 2021
Threads
7
Messages
39
Reaction score
31
Location
Sacremento, CA
Vehicles
mustang mache
Country flag
I ordered a Mach-E Premium all wheel drive extended range on 1/6/21.
The dealer accepted the order the next day.
On 2/18/21 I received an email stating that my build week would be May 24, 2021.

I asked my salesman to look the car up in the visibility report to verify the build week.
He gave me a printout that verified the build week and included the VIN number.

Ask your dealer to look up your order in the Vehicle Visibility Report, which is available to him 24/7.
What's the status of ur Mache?
Sponsored

 

67 Stang Convertible

Well-Known Member
First Name
Rich
Joined
Jan 27, 2021
Threads
50
Messages
1,686
Reaction score
2,439
Location
Georgia, USA
Vehicles
1967 Mustang, 2013 Kia Optima, 2018 Kia Sportage
Occupation
Physician
Country flag
Ordered Date 12/18/20
Build Week 5/31/21 (Production: In Progress)
My configurator @ Ford.com changed the build date last week to 1/31/21. Which after reading the forum is a good thing. Means production is underway. Still waiting on email and VIN. I may call the dealer today to ask about the Visibility Report. Thanks for the info!!!
 

murphy62

Well-Known Member
First Name
John
Joined
Apr 2, 2021
Threads
6
Messages
236
Reaction score
237
Location
Horsham, PA
Vehicles
2016 Tesla S90D, 2021 Mach-E AWD ER
Occupation
retired
Country flag
What's the status of ur Mache?
I received an email this morning stating that my Mach-E has been built. It proudly told me what my VIN is. I've known what my VIN is since February.

It estimates delivery between July 7 and July 13. That is strange since my 2013 Fusion Energi arrived in 14 days. Maybe it takes longer these days to fill a rail car.
 

machefan

Well-Known Member
Joined
Jan 14, 2020
Threads
26
Messages
1,719
Reaction score
2,450
Location
NJ
Vehicles
RR FE 21', Leaf 18' and Bronco BadLands 2022
Occupation
IT
Country flag
I received an email this morning stating that my Mach-E has been built. It proudly told me what my VIN is. I've known what my VIN is since February.

It estimates delivery between July 7 and July 13. That is strange since my 2013 Fusion Energi arrived in 14 days. Maybe it takes longer these days to fill a rail car.
It’s an estimate that usually is an over statement, but rail cars are restricted to 10 MPH. Slow go at best and sometimes they get a layover in KC for inspection.

Also the last few miles are truck to dealer which adds delay due to labor shortages.

Congrats either way :)
 


OP
OP

Longsally

Member
Joined
May 16, 2021
Threads
6
Messages
18
Reaction score
16
Location
GREENVILLE, SC
Vehicles
Mach E
Occupation
RN
Country flag
My understanding is extended range vehicles are in high demand with ER/AWD requiring the longest lead time. My salesperson contacted me and said if I dropped ER I’d get my car at least a month earlier. Honestly, I would just plan for 6 months between order and delivery. Took 3 months to get my build week and VIN.
Thanks for the info. I am coming up on 3 Months since I ordered in 12 days. I am on pins and needles to see when the salesman calls me tomorrow what he says. If I get a vin, I believe it is a one month wait time.
 

ADDZ71

Well-Known Member
First Name
Austin
Joined
Jan 11, 2021
Threads
10
Messages
217
Reaction score
215
Location
Brevard, NC
Vehicles
21 MME Premium ER AWD (sold) 22 MME GT (Del 5/22)
Occupation
Lithium expert
Country flag
Thanks for the info. I am coming up on 3 Months since I ordered in 12 days. I am on pins and needles to see when the salesman calls me tomorrow what he says. If I get a vin, I believe it is a one month wait time.
Longsally, I hate to be the bearer of bad news but getting the VIN does not signal that it is getting built only that it is scheduled. As an example I received my VIN in late February and it identified my build week as May 3. My car shipped May 10 and should arrive at the dealer in the next couple of days.
 

murphy62

Well-Known Member
First Name
John
Joined
Apr 2, 2021
Threads
6
Messages
236
Reaction score
237
Location
Horsham, PA
Vehicles
2016 Tesla S90D, 2021 Mach-E AWD ER
Occupation
retired
Country flag
Thanks for the info. I am coming up on 3 Months since I ordered in 12 days. I am on pins and needles to see when the salesman calls me tomorrow what he says. If I get a vin, I believe it is a one month wait time.
Ordered 1/6/21
Got VIN 2/18/21
Car built 5/31/21
Shipped 6/1/21
Expected delivery to East Coast 7/7/21 to 7/13/21.

Premium, AWD, ER
 
First Name
Michael
Joined
May 26, 2021
Threads
0
Messages
7
Reaction score
4
Location
Charlotte
Vehicles
2021 Mache Infinate Blue
Occupation
Data Management Manager
Country flag
I ordered mine 9/1/2020 and it is finally in route and set to be delivered 7/2/2021 - 7/8/2021

Edit: RWD, Extended Range, Infinite Blue.
 

TruWrecks

Well-Known Member
Joined
Jun 3, 2021
Threads
25
Messages
948
Reaction score
1,030
Location
Oregon
Vehicles
Mach-E Star White Premium AWD Ext (Ghost Stallion)
Occupation
Retired
Country flag
I ordered mine on 04/20/21. Dealer approved 04/22/21. Nothing but crickets since.
 

TruWrecks

Well-Known Member
Joined
Jun 3, 2021
Threads
25
Messages
948
Reaction score
1,030
Location
Oregon
Vehicles
Mach-E Star White Premium AWD Ext (Ghost Stallion)
Occupation
Retired
Country flag
Ask your dealer to check the status in his Vehicle Visibility Report.
I called Ford Marketing this afternoon. They looked it up and said it should get on the production schedule by the end of next week.
 
OP
OP

Longsally

Member
Joined
May 16, 2021
Threads
6
Messages
18
Reaction score
16
Location
GREENVILLE, SC
Vehicles
Mach E
Occupation
RN
Country flag
well, the dealer called me. No change of status on the visibility report. I wonder, if it gets to be September or October, does that mean I will get a 2022 car?
 

Jeffvisor

Well-Known Member
First Name
Jeff
Joined
Feb 24, 2021
Threads
35
Messages
851
Reaction score
807
Location
Harrisburg, PA
Vehicles
Ford Mustang Mach-e
Occupation
Retired
Country flag
well, the dealer called me. No change of status on the visibility report. I wonder, if it gets to be September or October, does that mean I will get a 2022 car?
I got my Vin# on 4/23 with a build date of 6/6 and a order date of 2/5
 

Carsinmyblood

Well-Known Member
First Name
Mitch
Joined
May 2, 2021
Threads
127
Messages
1,338
Reaction score
2,004
Location
Western NC
Vehicles
'53 XK120, '58 MGA, '66 E-Type, MME Prem, EX, awd
Occupation
Self employed
Country flag
well, the dealer called me. No change of status on the visibility report. I wonder, if it gets to be September or October, does that mean I will get a 2022 car?
I hope so.
Sponsored

 
 







Top