So 1/4 week build probably means mid Feb delivery at best?
 

ajmartineau

Well-Known Member
Joined
Jun 23, 2020
Threads
33
Messages
1,392
Reaction score
1,979
Location
Washington
Vehicles
2021 Mach-E
Country flag
How much padding does Ford put into their build schedules?
They have some algorithms that they use. I'm just wondering what the +/- is on a build date that 30, 60, 90 days out. Obviously, the + could be huge, but there is also that possibility that assembly goes quicker with fewer line stoppages than calculated for in the scheduling.
 

Bookworm214

Well-Known Member
First Name
Kim
Joined
Mar 11, 2020
Threads
7
Messages
374
Reaction score
384
Location
North Myrtle Beach, SC
Vehicles
Rapid Red Premium Mach-Ex
Occupation
Retired Truck Driver
Country flag
Submitted a form but it doesn't seem to have taken. :) Line 105, scheduled build date, week of January 18, 2021. VIN 3FMTK3R76MMA08xxx
 


makooy

Well-Known Member
Joined
Jun 29, 2020
Threads
7
Messages
532
Reaction score
869
Location
Rotterdam, NL
Vehicles
Mach-E RWD SR Lucid Red TP+
Occupation
IT Consultant
Country flag
Line 211 and line 327 are both mine.
the owner of the sheet can remove one and edit the other one:
scheduled build date = 1-dec-2020
schedules delivery date = 27-feb-2021
VIN 3FMTxxEM1MMA0xxxx
 

dbsb3233

Well-Known Member
First Name
TimCO
Joined
Dec 30, 2019
Threads
56
Messages
10,100
Reaction score
11,965
Location
Colorado, USA
Vehicles
2021 Mustang Mach-E FE, 2025 Porche Macan Electric
Occupation
Retired
Country flag
So 1/4 week build probably means mid Feb delivery at best?
That's what I'm guessing. Maybe early Feb, or even very late Jan if we get lucky and match up with the timing of a delivery just right. There's probably some cars that will just barely make or barely miss particular trains/trucks, with the next one a week later or something. I can only imagine how complex shipping thousands of cars to hundreds of cities/towns across the US and Canada must be.

How long they'll sit at the plant queuing up for delivery is a big question mark too. Might only take 2 weeks to get from Cuautitlan to Denver or Seattle or Cleveland, but maybe it'll be the 1500th car sitting on the plant lot for 2 weeks waiting for transport?

Don't really know, just speculating.
 

agoldman

Well-Known Member
Joined
Jan 23, 2020
Threads
54
Messages
3,007
Reaction score
2,482
Location
Charleston, SC
Vehicles
2024 Mach E GT vapor blue- perf pack-alloy wheels
Country flag
Line 211 and line 327 are both mine.
the owner of the sheet can remove one and edit the other one:
scheduled build date = 1-dec-2020
schedules delivery date = 27-feb-2021
VIN 3FMTxxEM1MMA0xxxx
2 months to deliver. ouch, but sounds about right based on real world scenarios.
 

bshaw

Well-Known Member
Joined
May 18, 2020
Threads
14
Messages
1,562
Reaction score
2,181
Location
Boston, MA
Vehicles
2021 Mustang Mach E 4X (Job 1)
Country flag
not 2 months but nearly 3 months between production and delivery.
Is this order being delivered in the Netherlands? That doesn't seem that bad actually. That's a long boat ride from Mexico, so 2x the time for US deliveries seems practical.
 

makooy

Well-Known Member
Joined
Jun 29, 2020
Threads
7
Messages
532
Reaction score
869
Location
Rotterdam, NL
Vehicles
Mach-E RWD SR Lucid Red TP+
Occupation
IT Consultant
Country flag
Is this order being delivered in the Netherlands? That doesn't seem that bad actually. That's a long boat ride from Mexico, so 2x the time for US deliveries seems practical.
correct. Boat trip of 23 days between Veracruz and Antwerp, Belgium.
 

FPLiptak

Well-Known Member
First Name
Frank
Joined
Jun 21, 2020
Threads
16
Messages
355
Reaction score
345
Location
Saint George, UT
Vehicles
Mach-E Premium ER AWD
Occupation
Retired
Country flag
Change submitted
Delete line 407 - same as 90
Update 90 with the following:
Build Date = 01/18/2021
VIN = 3FMTK3SU6MMA08546

Premium
AWD
Extended Range
Infinite Blue
Light Space Grey
Southwest Utah (St. George)
 

agoldman

Well-Known Member
Joined
Jan 23, 2020
Threads
54
Messages
3,007
Reaction score
2,482
Location
Charleston, SC
Vehicles
2024 Mach E GT vapor blue- perf pack-alloy wheels
Country flag
not 2 months but nearly 3 months between production and delivery.
Between that thought, and the low epa numbers... geeze... kinda deflated today about all this... :oops:
 

NEMuskRat

Well-Known Member
First Name
John
Joined
Jan 14, 2020
Threads
2
Messages
90
Reaction score
76
Location
Spfld, MA
Vehicles
1983 Delorean, 2007 SC Mustang, 2018 F150 FX4, 2019 Escape
Occupation
Electron Beam Eng
Country flag
How / where are we supposed to add information to the spreadsheet or is it all done now?

Did anyone get different days on the website (Sunday the 17th Jan) vs the received email (Monday the 18th Jan)?
 
Last edited:

NEMuskRat

Well-Known Member
First Name
John
Joined
Jan 14, 2020
Threads
2
Messages
90
Reaction score
76
Location
Spfld, MA
Vehicles
1983 Delorean, 2007 SC Mustang, 2018 F150 FX4, 2019 Escape
Occupation
Electron Beam Eng
Country flag
I think I missed where the VIN # should be viewed when it is supplied.

Would it be in an email or on the Ford reservation site somewhere? Just curious since some people with my build week already have a VIN #.
Sponsored

 




Top