That was fast!

bpbailey

Well-Known Member
First Name
BYRON
Joined
Sep 29, 2021
Threads
3
Messages
74
Reaction score
131
Location
Kauai, HI
Vehicles
'22 MME Select
Country flag
Ford just advised me, today, that my production week moved back from 2/14 to 2/21 (MME Select).
Sponsored

 

BTRYPWRDPONY

Well-Known Member
First Name
JAY
Joined
Aug 11, 2021
Threads
12
Messages
269
Reaction score
165
Location
CHICAGO, IL
Vehicles
2022 MachE GTPE DMG
Country flag
Finally after 6 months (and dealer screwing me with a 99 priority) I received my build date yesterday. Anyone know how long before I receive my vin# ?
 

Dewey

Active Member
First Name
Dewey
Joined
Nov 17, 2021
Threads
0
Messages
31
Reaction score
27
Location
New Jersey
Vehicles
Mach-E GT
Occupation
Engineer
Country flag
Ordered a base GT on 12/6/21.

Just rec'd an email that it is built as of today 2/4/22 with a scheduled delivery date of 3/9/22.

That would be 3 months from order to delivery if it holds. Not what I was expecting but I won't complain.

I am in one of the ZEV states but not sure if that played a role. No other special circumstances.
 


Mach1E

Well-Known Member
Joined
Sep 5, 2021
Threads
93
Messages
10,509
Reaction score
13,295
Location
Florida
Vehicles
69 Mach 1, 11 GT, 21 GTPE- sold, 24 Taycan 4S, 20 F type R
Country flag
I hate the dealer allocation system, should be first ordered first built, in a perfect world I guess.
They could do it that way, but for all the reasons already listed, it would actually be slower and everyone would wait longer to get their cars. But it would be more “fair.”
 
OP
OP

YFD_233

Well-Known Member
First Name
Scott
Joined
Jan 15, 2022
Threads
6
Messages
78
Reaction score
40
Location
NY
Vehicles
2021 Durango RT,
Occupation
Firefighter
Country flag
Finally after 6 months (and dealer screwing me with a 99 priority) I received my build date yesterday. Anyone know how long before I receive my vin# ?
build date you have a vin
 

1969Camaro

Well-Known Member
First Name
Joe
Joined
Aug 26, 2021
Threads
12
Messages
313
Reaction score
295
Location
Scottsdale AZ
Vehicles
2021 Mach E Premium, 2018 Prius Prime, 1969 Camaro
Occupation
Engineer
Country flag
Yes, thanks for that refresher on Manufacturing 101. That doesn't make it less frustrating to see a car spec'd identically to mine that was ordered after mine get assigned a build slot before mine.

I'm sure you can relate.
It is really frustrating that I'm on 6 months and still no build date and yet others are built and have delivery dates.
 

Monty

Active Member
First Name
Ray
Joined
Oct 28, 2021
Threads
0
Messages
27
Reaction score
7
Location
Indiana
Vehicles
Lincoln MKZ, MME Premium, LR, RWD
Occupation
Retired
Country flag
This system needs to be more transparent. Ordered in Aug. had to reorder in Sept. due to model year update. Given a Dec. build date, then update to Jan. 10. The web site then gave a delivery estimate of Feb 2. On Feb 3 the delivery estimate was revised to May 7. i’m ready to buy a Tesla and get away from all this FMC BS.
 
OP
OP

YFD_233

Well-Known Member
First Name
Scott
Joined
Jan 15, 2022
Threads
6
Messages
78
Reaction score
40
Location
NY
Vehicles
2021 Durango RT,
Occupation
Firefighter
Country flag
What do you mean? Do they email it to me, or do I have to call the dealer?
If your dealer put your email into Ford then Ford will send you updates like this. If not he has that info. If you have a build date then you have a vin.
Ford Mustang Mach-E That was fast! 7F36C1D2-4893-42AF-AEF0-A015ACA9D096
 

BTRYPWRDPONY

Well-Known Member
First Name
JAY
Joined
Aug 11, 2021
Threads
12
Messages
269
Reaction score
165
Location
CHICAGO, IL
Vehicles
2022 MachE GTPE DMG
Country flag
It is really frustrating that I'm on 6 months and still no build date and yet others are built and have delivery dates.
Did you get a order sheet from your dealer with the priority code? Finally after 6 months I got one from them and had a priority code of 99 ( which tells FORD not to build yet) complained and got switched to 19 week later got my build date as of yesterday. Hope this helps. I'll try to post a copy of my sheet.

Ford Mustang Mach-E That was fast! Screenshot_20220204-105122
 
Last edited:

gbabes66

Active Member
First Name
Gerry
Joined
Feb 18, 2021
Threads
0
Messages
30
Reaction score
48
Location
Detroit
Vehicles
Waiting for MME, Premium AWD, ER
Occupation
Attorney
Country flag
^&%!@!!

Ordered a GTPE on 12/22/21, still not scheduled.
I ordered 10/4/21. Ford marked it received 10/17/21. California Rte 1, Ext Range, Metallic White. Not yet scheduled.
 

1969Camaro

Well-Known Member
First Name
Joe
Joined
Aug 26, 2021
Threads
12
Messages
313
Reaction score
295
Location
Scottsdale AZ
Vehicles
2021 Mach E Premium, 2018 Prius Prime, 1969 Camaro
Occupation
Engineer
Country flag
Did you get a order sheet from your dealer with the priority code? Finally after 6 months I got one from them and had a priority code of 99 ( which tells FORD not to build yet) complained and got switched to 19 week later got my build date as of yesterday. Hope this helps. I'll try to post a copy of my sheet.

Screenshot_20220204-105122.png
Yep got one in October and asked again to see it in December. No change priority code 19. Dealer says code really doesn't do anything... why have it then?