@trutolife27 What would a reasonable guesstimate from build week to delivery? Understand that destination will make a big difference but we looking 2-3 weeks? A month to 6 weeks? Do we think the ones with build week in 11/23, 11/30 will get them by the end of the year?
 

GoGoGadgetMachE

Well-Known Member
First Name
Michael
Joined
Jan 23, 2020
Messages
1,311
Reaction score
2,554
Location
Ohio
First Name
Michael
Vehicles
2013 Ford Fusion Energi, 2021 Mach-E First Edition (ordered)
Country flag

Redundant

Well-Known Member
First Name
Jim
Joined
Nov 18, 2019
Messages
257
Reaction score
286
Location
New Jersey
First Name
Jim
Vehicles
1 Ford Edge, 1 Ford Flex, 2 Ford Escapes
Country flag
This has probably been asked but do we assume if a car has a build date that it makes it all the way down the line by the end of that week?
I am concerned about my build week, 12/21. I am afraid my car is going to be half way down the line, they are going to shut down for Christmas and whenever they come back, after New Years?, the line will be startling up cold. "Where were we with this car?" "Did I tighten all the bolts? Probably did before I left." I am not thrilled to be Christmas week is my point. I would rather it be built in January when they are back and have a rhythm.
 
OP
trutolife27

trutolife27

Well-Known Member
Joined
Jul 13, 2020
Messages
900
Reaction score
4,536
Location
kentucky
Vehicles
Lincoln mkx , Ford f-150
Country flag
Ok for the holiday shut down. All lines will be emptied out. Your mainline, chassis, trim won't have anything on them. Workers will come back a day early to fill the float back up and block build to everything filled back up for the start after the holidays.
 

methorian

Well-Known Member
Joined
Nov 18, 2019
Messages
380
Reaction score
559
Location
Roanoke, VA
Vehicles
Mach-E First Edition (Reservation)
Country flag
Ok for the holiday shut down. All lines will be emptied out. Your mainline, chassis, trim won't have anything on them. Workers will come back a day early to fill the float back up and block build to everything filled back up for the start after the holidays.
It may have been answered all ready, but how long do they normally shut down around Christmas/New Years? Seems weird to have so many scheduled for the week of December 21st if they'll be closing down that week.
 

ChasingCoral

Well-Known Member
First Name
Mark
Joined
Feb 3, 2020
Messages
4,116
Reaction score
6,817
Location
Maryland
First Name
Mark
Vehicles
Mach-E FE reserved, Nissan Leaf, Toyota Tacoma
Country flag
It may have been answered all ready, but how long do they normally shut down around Christmas/New Years? Seems weird to have so many scheduled for the week of December 21st if they'll be closing down that week.
We've heard from two Ford insiders that the plant shut down will last approximately one week.
 

Jimrpa

Well-Known Member
First Name
Jim
Joined
Sep 10, 2020
Messages
277
Reaction score
383
Location
Wayne, PA
First Name
Jim
Vehicles
2018 Ford Escape
Country flag
I am concerned about my build week, 12/21. I am afraid my car is going to be half way down the line, they are going to shut down for Christmas and whenever they come back, after New Years?, the line will be startling up cold. "Where were we with this car?" "Did I tighten all the bolts? Probably did before I left." I am not thrilled to be Christmas week is my point. I would rather it be built in January when they are back and have a rhythm.
Never buy a car built on a Friday or a Monday 😀😀
 

ChasingCoral

Well-Known Member
First Name
Mark
Joined
Feb 3, 2020
Messages
4,116
Reaction score
6,817
Location
Maryland
First Name
Mark
Vehicles
Mach-E FE reserved, Nissan Leaf, Toyota Tacoma
Country flag
Never buy a car built on a Friday or a Monday 😀😀
Or any time when employees are being forced to work during a pandemic.

Edit: That was a reference to Tesla forcing their employees to come in or lose their jobs.
 
Last edited:

makooy

Well-Known Member
Joined
Jun 29, 2020
Messages
269
Reaction score
390
Location
NL
Vehicles
current Audi A3 - ordered Mach-E RWD Lucid Red
Country flag
@trutolife27 What would a reasonable guesstimate from build week to delivery? Understand that destination will make a big difference but we looking 2-3 weeks? A month to 6 weeks? Do we think the ones with build week in 11/23, 11/30 will get them by the end of the year?
According to my dealer my car is being build the week of 20-nov-20 and he expects delivery at the dealer in the week of 20-feb-2021. so building the car, transport to port, boat trip to Europe, from boat to my dealer takes approx 3months/90days.
Only the boat trip alone is 30-35 days.
 

mattsaradan

Well-Known Member
First Name
Matt
Joined
Dec 27, 2019
Messages
87
Reaction score
95
Location
Baltimore, MD
First Name
Matt
Vehicles
Mustang Mach E Premium AWD SR; Fusion Energi Platinum
Country flag
Ok for the holiday shut down. All lines will be emptied out. Your mainline, chassis, trim won't have anything on them. Workers will come back a day early to fill the float back up and block build to everything filled back up for the start after the holidays.
In other words, if Ford is able to stick to schedule, any orders they have said are scheduled for build week of 12/21 will be completed by no later than close on 12/23?
 



 