Update on Mach-E launch progress from engineering friends in Mexico

Redundant

Well-Known Member
First Name
Jim
Joined
Nov 18, 2019
Threads
18
Messages
489
Reaction score
545
Location
New Jersey
Vehicles
Mach-E 4X-Space White, 1 Ford Flex, 2 Ford Escapes
Country flag
This has probably been asked but do we assume if a car has a build date that it makes it all the way down the line by the end of that week?
I am concerned about my build week, 12/21. I am afraid my car is going to be half way down the line, they are going to shut down for Christmas and whenever they come back, after New Years?, the line will be startling up cold. "Where were we with this car?" "Did I tighten all the bolts? Probably did before I left." I am not thrilled to be Christmas week is my point. I would rather it be built in January when they are back and have a rhythm.
Sponsored

 
OP
OP
trutolife27

trutolife27

Well-Known Member
Joined
Jul 13, 2020
Threads
127
Messages
3,266
Reaction score
13,885
Location
Bourbon Country.
Vehicles
Lincoln mkx , Ford f-150, Mache
Country flag
Ok for the holiday shut down. All lines will be emptied out. Your mainline, chassis, trim won't have anything on them. Workers will come back a day early to fill the float back up and block build to everything filled back up for the start after the holidays.
 

methorian

Well-Known Member
Joined
Nov 18, 2019
Threads
15
Messages
1,531
Reaction score
2,390
Location
Roanoke, VA
Vehicles
Mach-E First Edition, Mini Cooper SE
Occupation
IT Admin
Country flag
Ok for the holiday shut down. All lines will be emptied out. Your mainline, chassis, trim won't have anything on them. Workers will come back a day early to fill the float back up and block build to everything filled back up for the start after the holidays.
It may have been answered all ready, but how long do they normally shut down around Christmas/New Years? Seems weird to have so many scheduled for the week of December 21st if they'll be closing down that week.
 


ChasingCoral

Well-Known Member
First Name
Mark
Joined
Feb 3, 2020
Threads
376
Messages
12,403
Reaction score
24,517
Location
Maryland
Vehicles
GB E4X FE, Leaf, Tacoma, F-150 Lightning ordered
Occupation
Retired oceanographer
Country flag
It may have been answered all ready, but how long do they normally shut down around Christmas/New Years? Seems weird to have so many scheduled for the week of December 21st if they'll be closing down that week.
We've heard from two Ford insiders that the plant shut down will last approximately one week.
 

Jimrpa

Well-Known Member
First Name
Jim
Joined
Sep 10, 2020
Threads
230
Messages
7,009
Reaction score
9,298
Location
Wayne, PA
Vehicles
2021 Infinite Blue Premium Mustang Mach E ER AWD
Occupation
Retied (formerly tried to herd highly technical, independent cats)
Country flag
I am concerned about my build week, 12/21. I am afraid my car is going to be half way down the line, they are going to shut down for Christmas and whenever they come back, after New Years?, the line will be startling up cold. "Where were we with this car?" "Did I tighten all the bolts? Probably did before I left." I am not thrilled to be Christmas week is my point. I would rather it be built in January when they are back and have a rhythm.
Never buy a car built on a Friday or a Monday ??
 

ChasingCoral

Well-Known Member
First Name
Mark
Joined
Feb 3, 2020
Threads
376
Messages
12,403
Reaction score
24,517
Location
Maryland
Vehicles
GB E4X FE, Leaf, Tacoma, F-150 Lightning ordered
Occupation
Retired oceanographer
Country flag
Never buy a car built on a Friday or a Monday ??
Or any time when employees are being forced to work during a pandemic.

Edit: That was a reference to Tesla forcing their employees to come in or lose their jobs.
 
Last edited:

Gimme_my_MME

Well-Known Member
Joined
Oct 12, 2020
Threads
11
Messages
1,716
Reaction score
5,451
Location
Dearborn
Vehicles
Grabber Blue First Edition Mustang Mach-E
Occupation
Engineer
Country flag
Never buy a car built on a Friday or a Monday ??
I've also heard it as never buy a car built on a Friday, Monday, or the first year.

And yet we are all here arguing over who is gonna get theirs as the first off the brand new assembly line
 

makooy

Well-Known Member
Joined
Jun 29, 2020
Threads
7
Messages
532
Reaction score
869
Location
Rotterdam, NL
Vehicles
Mach-E RWD SR Lucid Red TP+
Occupation
IT Consultant
Country flag
@trutolife27 What would a reasonable guesstimate from build week to delivery? Understand that destination will make a big difference but we looking 2-3 weeks? A month to 6 weeks? Do we think the ones with build week in 11/23, 11/30 will get them by the end of the year?
According to my dealer my car is being build the week of 20-nov-20 and he expects delivery at the dealer in the week of 20-feb-2021. so building the car, transport to port, boat trip to Europe, from boat to my dealer takes approx 3months/90days.
Only the boat trip alone is 30-35 days.
 

mattsaradan

Well-Known Member
First Name
Matt
Joined
Dec 27, 2019
Threads
5
Messages
202
Reaction score
186
Location
Baltimore, MD
Vehicles
Mustang Mach E Premium AWD SR; Fusion Energi Platinum
Country flag
Ok for the holiday shut down. All lines will be emptied out. Your mainline, chassis, trim won't have anything on them. Workers will come back a day early to fill the float back up and block build to everything filled back up for the start after the holidays.
In other words, if Ford is able to stick to schedule, any orders they have said are scheduled for build week of 12/21 will be completed by no later than close on 12/23?
 

JellyBelly

Well-Known Member
First Name
Kris
Joined
Jun 27, 2020
Threads
14
Messages
2,481
Reaction score
1,937
Location
San Diego
Vehicles
MME RR FE
Country flag
I am concerned about my build week, 12/21. I am afraid my car is going to be half way down the line, they are going to shut down for Christmas and whenever they come back, after New Years?, the line will be startling up cold. "Where were we with this car?" "Did I tighten all the bolts? Probably did before I left." I am not thrilled to be Christmas week is my point. I would rather it be built in January when they are back and have a rhythm.
Haha - I am sure they wont leave your car that way -
 

JellyBelly

Well-Known Member
First Name
Kris
Joined
Jun 27, 2020
Threads
14
Messages
2,481
Reaction score
1,937
Location
San Diego
Vehicles
MME RR FE
Country flag
According to my dealer my car is being build the week of 20-nov-20 and he expects delivery at the dealer in the week of 20-feb-2021. so building the car, transport to port, boat trip to Europe, from boat to my dealer takes approx 3months/90days.
Only the boat trip alone is 30-35 days.
More reason for those EU cars to be built sooner than later