Just curious as to status of anyone's order for a California Rt 1 package. I put in my order on April 23, 2021 and got confirmation of the order being accepted by my local dealership, but then crickets. It has only been about 10 weeks, so maybe I am just impatient. But it also could be that the CA Rt 1 uses the extended range battery - I have seen many others posting that the ER Battery seems to delay the other models as well. I'd like to hear from anyone with a similar order date about any production date notifications.
Ford is currently scheduling production for vehicles ordered in March. You got at least another month or so.
Sponsored

 

harrysiii

Well-Known Member
First Name
Harry
Joined
May 13, 2020
Threads
16
Messages
608
Reaction score
624
Location
New Hampshire
Vehicles
2025 Ford Bronco Badlands Sas, 2025 Toyota Grand Highlander Hybrid MAX Platinum
Country flag
Got my window sticker today for my GTPE schedule build week of 7/11/21!!
 

Carmel Mach E Auto

Well-Known Member
Joined
Oct 30, 2020
Threads
7
Messages
421
Reaction score
570
Location
Canton, MI
Vehicles
Mach E GT PE, Focus Electric
Country flag
Got my window sticker today for my GTPE schedule build week of 7/11/21!!
Nice! That tracks - I got mine exactly a week ago for my 7/4 build week.

Still no movement yet on the car being built. I assume they are assembling it as we speak, but as far as I know, there's no way to know for sure when it starts down the line. I'm hoping to see an update / get an email by end of week.
 

Ochroma

Active Member
Joined
May 8, 2021
Threads
3
Messages
42
Reaction score
59
Location
North Carolina
Vehicles
'21 Mach-E ER AWD Premium Infinite Blue
Occupation
Engineer
Country flag
To all those with June/July build dates that haven't received any "Built" or "Shipped" dates. I just spoke with a Ford representative about my vehicle (In Production 6/14/21) and they shared that the MX assembly plant is currently "on hold" for releasing MMEs. They weren't able to give an estimate for when that hold would be lifted. So my vehicle is sitting somewhere at the plant still and I anticipate many others' vehicles are as well (doesn't bode well for my ETA delivery of 8/6). My assumption is that there are indeed component shortages and only a lucky few are getting out.

For clarity, my MME order is for a Premium, Extended Battery, AWD model.
 


Carmel Mach E Auto

Well-Known Member
Joined
Oct 30, 2020
Threads
7
Messages
421
Reaction score
570
Location
Canton, MI
Vehicles
Mach E GT PE, Focus Electric
Country flag
To all those with June/July build dates that haven't received any "Built" or "Shipped" dates. I just spoke with a Ford representative about my vehicle (In Production 6/14/21) and they shared that the MX assembly plant is currently "on hold" for releasing MMEs. They weren't able to give an estimate for when that hold would be lifted. So my vehicle is sitting somewhere at the plant still and I anticipate many others' vehicles are as well (doesn't bode well for my ETA delivery of 8/6). My assumption is that there are indeed component shortages and only a lucky few are getting out.

For clarity, my MME order is for a Premium, Extended Battery, AWD model.
Wow that is very unfortunate to hear. Just as the logistics bottleneck shows signs of being alleviated, the component shortage might be threatening to grind things to a halt. Let's hope that, if it is indeed a lack of microchips or other parts, they are able to reroute supply from elsewhere.
 

harrysiii

Well-Known Member
First Name
Harry
Joined
May 13, 2020
Threads
16
Messages
608
Reaction score
624
Location
New Hampshire
Vehicles
2025 Ford Bronco Badlands Sas, 2025 Toyota Grand Highlander Hybrid MAX Platinum
Country flag
Wow that is very unfortunate to hear. Just as the logistics bottleneck shows signs of being alleviated, the component shortage might be threatening to grind things to a halt. Let's hope that, if it is indeed a lack of microchips or other parts, they are able to reroute supply from elsewhere.
Or....we can hope standard Mach-E's are on hold so they can bust out some GT's? :)
 

willowma

Well-Known Member
Joined
Feb 28, 2021
Threads
8
Messages
98
Reaction score
58
Location
Lexington, MA
Vehicles
MME Premium ER AWD on order
Country flag
To all those with June/July build dates that haven't received any "Built" or "Shipped" dates. I just spoke with a Ford representative about my vehicle (In Production 6/14/21) and they shared that the MX assembly plant is currently "on hold" for releasing MMEs. They weren't able to give an estimate for when that hold would be lifted. So my vehicle is sitting somewhere at the plant still and I anticipate many others' vehicles are as well (doesn't bode well for my ETA delivery of 8/6). My assumption is that there are indeed component shortages and only a lucky few are getting out.

For clarity, my MME order is for a Premium, Extended Battery, AWD model.
Do you still have an ETA in the tracker? The tracker still shows my Production Date as June 26, but my ETA date of 8/17 and then 10/31 was then reset to N/A.
 

Carmel Mach E Auto

Well-Known Member
Joined
Oct 30, 2020
Threads
7
Messages
421
Reaction score
570
Location
Canton, MI
Vehicles
Mach E GT PE, Focus Electric
Country flag
Or....we can hope standard Mach-E's are on hold so they can bust out some GT's? :)
That could be, especially if there was some additional tooling or other setup necessary to begin regular production of the new model. You'd hope that was all done in advance without disrupting the rest of the line, and we know from the aerial photo that the they've been building GTs in some capacity since before this week. But perhaps they needed to pause to get full volume GT production underway.
 

Carmel Mach E Auto

Well-Known Member
Joined
Oct 30, 2020
Threads
7
Messages
421
Reaction score
570
Location
Canton, MI
Vehicles
Mach E GT PE, Focus Electric
Country flag
@Kamuelaflyer

Closer to that date, you’ll also get a beginning of build date. The car will finish a week or so after that date.
Forgive me for quoting a post from another thread, but I didn't want to bump it just to ask about this one point. I haven't seen discussion of this "beginning of build date". My understanding from reading through posts about the various order trackers is that the "Production Date" is the date the vehicle finishes assembly, not the date it begins assembly. So where do I find this begin date? Is it only available in the "Vehicle Visibility" report that can only be requested from my dealership?
 

harrysiii

Well-Known Member
First Name
Harry
Joined
May 13, 2020
Threads
16
Messages
608
Reaction score
624
Location
New Hampshire
Vehicles
2025 Ford Bronco Badlands Sas, 2025 Toyota Grand Highlander Hybrid MAX Platinum
Country flag
That could be, especially if there was some additional tooling or other setup necessary to begin regular production of the new model. You'd hope that was all done in advance without disrupting the rest of the line, and we know from the aerial photo that the they've been building GTs in some capacity since before this week. But perhaps they needed to pause to get full volume GT production underway.
Interesting! I haven't seen nor heard of this aeriel photo, but I'd love to! :)

@Kamuelaflyer



Forgive me for quoting a post from another thread, but I didn't want to bump it just to ask about this one point. I haven't seen discussion of this "beginning of build date". My understanding from reading through posts about the various order trackers is that the "Production Date" is the date the vehicle finishes assembly, not the date it begins assembly. So where do I find this begin date? Is it only available in the "Vehicle Visibility" report that can only be requested from my dealership?
I did not realize that! I thought it was when production started too, so that would be awesome if it is almost done now! :) :cool:
 

Ochroma

Active Member
Joined
May 8, 2021
Threads
3
Messages
42
Reaction score
59
Location
North Carolina
Vehicles
'21 Mach-E ER AWD Premium Infinite Blue
Occupation
Engineer
Country flag
Do you still have an ETA in the tracker? The tracker still shows my Production Date as June 26, but my ETA date of 8/17 and then 10/31 was then reset to N/A.
Yes I still have a delivery ETA of 8/6 which has not changed for me. Just no "Built" or "Shipped" dates.

@Kamuelaflyer
Forgive me for quoting a post from another thread, but I didn't want to bump it just to ask about this one point. I haven't seen discussion of this "beginning of build date". My understanding from reading through posts about the various order trackers is that the "Production Date" is the date the vehicle finishes assembly, not the date it begins assembly. So where do I find this begin date? Is it only available in the "Vehicle Visibility" report that can only be requested from my dealership?
In the Ford Order tracker (https://shop.ford.com/vehicleordertracking#/status) there is a "In Production" date which is the day or more broadly the week the vehicle started being built. Once it is finished you will get a "Built" date and then once it is shipped from the plant, you will get a "Shipped" date. The order reservation tracker in your Ford Account should also show these dates on the left side of the screen when available.
 

Carmel Mach E Auto

Well-Known Member
Joined
Oct 30, 2020
Threads
7
Messages
421
Reaction score
570
Location
Canton, MI
Vehicles
Mach E GT PE, Focus Electric
Country flag
In the Ford Order tracker (https://shop.ford.com/vehicleordertracking#/status) there is a "In Production" date which is the day or more broadly the week the vehicle started being built.
Thanks. I was aware of that particular tracker and that particular state/step (which my vehicle has been in since last Wednesday). However, it was not clear that the date that gets shown there reflects the start of the assembly process. With so many different trackers in play and so many different discussion threads, it's difficult to keep track (ha!) of all the information. But what I had understood (and was apparently mistaken about) was that the date for that step would be filled in once the vehicle ends production, not begins production. However, I admit that I could not resolve that understanding with the fact that the very next step is "Built" which would seem to cover that same date. Maybe what was actually being communicated in posts I read is that, while the "In Production" date indeed reflects the date assembly started, it may not actually appear in the tracker until later. That is to say, perhaps the date may be filled in later, retroactively? I hope that is the case because, as I say, my Mach-E has been "In Production" since last week, but at this point no date has been reported yet. I'd like to believe there's a chance the actual assembly process did already commence, but the tracker simply lags a bit.

Once it is finished you will get a "Built" date and then once it is shipped from the plant, you will get a "Shipped" date.
Thanks, for confirming that. Those I think I was pretty clear on, but it's good to know.

The order reservation tracker in your Ford Account should also show these dates on the left side of the screen when available.
I hope so, yes. I haven't referred to that very often since my order moved into a state where the other trackers have information on my VIN. They are more convenient since they do not require me to log into my Ford account. Of course, this also means they offer less privacy (but that's another discussion).
 

Carmel Mach E Auto

Well-Known Member
Joined
Oct 30, 2020
Threads
7
Messages
421
Reaction score
570
Location
Canton, MI
Vehicles
Mach E GT PE, Focus Electric
Country flag

Ochroma

Active Member
Joined
May 8, 2021
Threads
3
Messages
42
Reaction score
59
Location
North Carolina
Vehicles
'21 Mach-E ER AWD Premium Infinite Blue
Occupation
Engineer
Country flag
Thanks. I was aware of that particular tracker and that particular state/step (which my vehicle has been in since last Wednesday). However, it was not clear that the date that gets shown there reflects the start of the assembly process. With so many different trackers in play and so many different discussion threads, it's difficult to keep track (ha!) of all the information. But what I had understood (and was apparently mistaken about) was that the date for that step would be filled in once the vehicle ends production, not begins production. However, I admit that I could not resolve that understanding with the fact that the very next step is "Built" which would seem to cover that same date. Maybe what was actually being communicated in posts I read is that, while the "In Production" date indeed reflects the date assembly started, it may not actually appear in the tracker until later. That is to say, perhaps the date may be filled in later, retroactively? I hope that is the case because, as I say, my Mach-E has been "In Production" since last week, but at this point no date has been reported yet. I'd like to believe there's a chance the actual assembly process did already commence, but the tracker simply lags a bit.
That's essentially what I'm assuming as well. Here in the forums, most people (with build weeks in May and early June) were reporting that they were getting "Built" dates (meaning completed production) and "Shipped" dates the same week as or week after the "In Production" date. Since that doesn't seem to be happening for many of the June/July build week orders, I think the vehicle builds are starting on schedule but they are still waiting to be completed (either due to plant issues or component availability).