01/10/22 Build Week Chat/Gang

Craigeddy111

Well-Known Member
First Name
Craig
Joined
Sep 17, 2021
Threads
7
Messages
677
Reaction score
957
Location
Fort Worth
Vehicles
2022 MME Premium, 2022 KIA EV6 GT Line RWD
Country flag
This morning the car was still in production since 1/15, but this evening it showed that the car was built and shipped! This is a GTPE with Blue Cruise from 003565, 134/300. I have not received an e-mail from Ford yet, and there is no estimated delivery day yet, but "transit times vary from an average of 12 to 28 days..." So I am relieved and happy!!
Lucky! Ordering site has been down for me to check all day. I shall wait until tomorrow ?
Sponsored

 

Larry Paul

Well-Known Member
First Name
Larry
Joined
Aug 27, 2021
Threads
22
Messages
835
Reaction score
950
Location
Southern California
Vehicles
MME-GTPE, Sunbeam Tiger w1970 Boss302, 2002Rav4EV
Country flag
Lucky! Ordering site has been down for me to check all day. I shall wait until tomorrow ?
i have not had access most of the day. My car is the same configuration GTPE w/BC, with a lower production number in the same build group, built on the same day.
 

Progress

Well-Known Member
First Name
Rufus
Joined
Sep 11, 2021
Threads
7
Messages
167
Reaction score
244
Location
San Diego
Vehicles
2022 Red MME GTPE
Occupation
retired
Country flag
i have not had access most of the day. My car is the same configuration GTPE w/BC, with a lower production number in the same build group, built on the same day.
Hopefully yours is shipped, too!
 

Craigeddy111

Well-Known Member
First Name
Craig
Joined
Sep 17, 2021
Threads
7
Messages
677
Reaction score
957
Location
Fort Worth
Vehicles
2022 MME Premium, 2022 KIA EV6 GT Line RWD
Country flag
i have not had access most of the day. My car is the same configuration GTPE w/BC, with a lower production number in the same build group, built on the same day.
Just got logged in this morning. No update for me yet. Still in production.
 

SublimeRkz

Member
First Name
Tom
Joined
Jan 12, 2022
Threads
0
Messages
23
Reaction score
60
Location
West Sacramento, CA
Vehicles
2022 Ford Mustang Mach E Premium ER
Occupation
Bankruptcy Law
Country flag
I'm also still "In Production." Anyone with a Premium in the 1/10 build week receive a "Shipped" email yet?
 


will

Well-Known Member
First Name
Not Will
Joined
Jun 18, 2021
Threads
8
Messages
314
Reaction score
385
Location
FL
Vehicles
2017 Ridgeline RTL-T, 2022 MME Prem Ext Rwd
Country flag
Last edited:

capnhowdy21

Well-Known Member
First Name
Dan
Joined
Oct 21, 2021
Threads
3
Messages
174
Reaction score
231
Location
Media, PA
Vehicles
2022 MachE Premium, 2021 Subaru Crosstrek
Occupation
Development Manager
Country flag
I'm also still "In Production." Anyone with a Premium in the 1/10 build week receive a "Shipped" email yet?
Got built email but not shipped.
 

JonathanEzor

Well-Known Member
First Name
Jonathan
Joined
Sep 17, 2020
Threads
28
Messages
319
Reaction score
472
Location
Long Island, NY
Vehicles
2022 MME GT, Taurus, C-MAX Energi, Chrysler PacHy
Country flag
Still awaiting both built and shipped e-mail; per the site, I've been in production since 1/15. {Jonathan}
 

RickMachE

Well-Known Member
Joined
Jul 1, 2021
Threads
204
Messages
13,375
Reaction score
18,261
Location
SE MI
Vehicles
2022 Mach-E Premium 4X, 2022 Lightning Lariat
Country flag
Which is it?



Or

 

Mds1029

Active Member
First Name
Melissa
Joined
Jan 5, 2022
Threads
0
Messages
44
Reaction score
72
Location
Central Alabama
Vehicles
2016 Honda Civic Touring, Mach-e on order!
Country flag
Update of no update here.
Batch 3541...58/300.
"In Production" since 1/5 (or 1/14 on the tracker.) And a ETA of 2/13/22.... but no emails. ?‍♀??
 

Larry Paul

Well-Known Member
First Name
Larry
Joined
Aug 27, 2021
Threads
22
Messages
835
Reaction score
950
Location
Southern California
Vehicles
MME-GTPE, Sunbeam Tiger w1970 Boss302, 2002Rav4EV
Country flag
So using Will's e-mail, it is saying it take between 28 to 34 days of shipping time, at least to Florida. Assuming that is similar shipping time to California, and since I have have had a scheduled ETA of 3/11 on the website and the dealer last showed my window for delivery is March 5-11, if I assume they scheduled my production delay long before I received an ETA and also back out the shipping time, I expect my car is scheduled to leave the factory around Feb 6.
 

JohnnyMachE

Well-Known Member
First Name
John
Joined
Sep 18, 2021
Threads
1
Messages
143
Reaction score
178
Location
Texas
Vehicles
Toyota Tundra, Mustang Mach-E SEL
Country flag
Still In Production(01/19) with the same estimated delivery date (03/03). No new emails.
 

NGE OC

Well-Known Member
First Name
NGE
Joined
Jan 22, 2022
Threads
0
Messages
327
Reaction score
359
Location
Orange County, CA, usa
Vehicles
‘22 Mach-E Premium AWD ER,MBZ C300,Porsche Cayman
Occupation
Retired (math)
Country flag
Congrats to all with good news!
Updating estimate of time Mexico to KC: 15 days, it seems.
No further news here: still in production (01/19/22) with same delivery estimate of 03/16/22 to OC, CA. No emails.
317/630 in batch 3639. Premium, AWD, ER.
 

adam_thedad

Well-Known Member
First Name
Adam
Joined
Aug 24, 2021
Threads
15
Messages
80
Reaction score
73
Location
Orange County, CA
Vehicles
Mach E Select (Route 1 on Order)
Country flag
Got my shipped email today! Estimated arrival between 3/7 and 3/13, a RWD CA RT 1 in Rapid Red. Coming to Southern California. For reference I was 3639, 220/630. Still pending in Palsapp though.
Sponsored

 
 




Top