So, my status changed from arrived at Junction Point to arrived rail. I have no idea what the new status means. Is it now in Kansas City? My ETA has not changed although seems rather unrealistic at this point.

Ford Mustang Mach-E List of 2025 Orders and Times Mach
Sponsored

 

highland58

Well-Known Member
First Name
Dave
Joined
Jan 6, 2020
Threads
22
Messages
1,492
Reaction score
1,803
Location
Seattle area - south King county
Vehicles
2025 Mach-E Rally, 2023 Bolt EUV, 2018 F150 XLT
Occupation
IT Solutions Architect
Country flag
So, my status changed from arrived at Junction Point to arrived rail. I have no idea what the new status means. Is it now in Kansas City? My ETA has not changed although seems rather unrealistic at this point.

Mach e.webp
Arrived RAIL sounds like it will now be unloaded from the train, either to be trucked to a ramp on a different railroad, or trucked to the dealer.
 
OP
OP
Pioneer898

Pioneer898

Well-Known Member
Joined
Dec 15, 2024
Threads
1
Messages
117
Reaction score
259
Location
AK
Vehicles
2025 GTPE | 2013 Ford Fusion | 2000 Yamaha V-Star 1100 Classic
Occupation
Software Engineer
Sweet, I'm not "In Transit," and the main status is Shipped. Woot!

@Pioneer898 You seeing the same thing?
Mine just updated last night to Shipped! It pushed my ETA a few days, but could be much worse. It went from May 11-17 to May 15-21.


Ford Mustang Mach-E List of 2025 Orders and Times 1743429976596-r
 

ZombieJester

Well-Known Member
First Name
Josh
Joined
Apr 8, 2022
Threads
6
Messages
199
Reaction score
133
Location
Lake Forest, CA
Vehicles
2025 Shadow Black Mach-E Premium Extended/ Retired: 21 Mache-X Rapid Red
Country flag
No change on mine.

Extended Details
Market

USA
Allocation Region
71
Primary Status
Awaiting Shipment
Last Completed Status
Received (03/21/2025 08:46)
Invoice Date
02/21/2025
Build Week
02/24/2025
Build Date
03/01/2025
Product Verification Date
03/03/2025
Transit Days
22
Release Date
03/24/2025
Shipped Date
--
ETA
04/21/2025 - 04/27/2025 (Code 32)
Final Delivered Date
--
 

StevenC56

Well-Known Member
First Name
Steven
Joined
Feb 13, 2025
Threads
2
Messages
510
Reaction score
506
Location
Fresno, California
Vehicles
2025 Mach E GT Glacier Gray "Maximus", 2024 Lightning Lariat Avalanche "Rex"
Occupation
Retired
Does it normally take 1-2 months to get a unit from Mexico to a dealer? Seems crazy.
 


highland58

Well-Known Member
First Name
Dave
Joined
Jan 6, 2020
Threads
22
Messages
1,492
Reaction score
1,803
Location
Seattle area - south King county
Vehicles
2025 Mach-E Rally, 2023 Bolt EUV, 2018 F150 XLT
Occupation
IT Solutions Architect
Country flag
Last Completed Status
Arrived at Junction Point (03/31/2025 08:18)

No other new info to go along with that...
 
OP
OP
Pioneer898

Pioneer898

Well-Known Member
Joined
Dec 15, 2024
Threads
1
Messages
117
Reaction score
259
Location
AK
Vehicles
2025 GTPE | 2013 Ford Fusion | 2000 Yamaha V-Star 1100 Classic
Occupation
Software Engineer
I suppose the question now is whether or not we should be counting these new dates as the shipped day for the spreadsheet... thoughts?
 

DragonmasterLou

Well-Known Member
Joined
Mar 17, 2025
Threads
3
Messages
140
Reaction score
110
Location
Massachusetts
Vehicles
2025 Mustang Mach E Premium (coming soon)"
Occupation
Software Engineer
This is very confusing as I'm seeing people posting cars with later manufacturing dates than mine that seem to be making more progress than mine is...
 

highland58

Well-Known Member
First Name
Dave
Joined
Jan 6, 2020
Threads
22
Messages
1,492
Reaction score
1,803
Location
Seattle area - south King county
Vehicles
2025 Mach-E Rally, 2023 Bolt EUV, 2018 F150 XLT
Occupation
IT Solutions Architect
Country flag
I suppose the question now is whether or not we should be counting these new dates as the shipped day for the spreadsheet... thoughts?
IMO the original ship date from the factory should be the one listed, otherwise we are comparing apples to oranges.
 

ZombieJester

Well-Known Member
First Name
Josh
Joined
Apr 8, 2022
Threads
6
Messages
199
Reaction score
133
Location
Lake Forest, CA
Vehicles
2025 Shadow Black Mach-E Premium Extended/ Retired: 21 Mache-X Rapid Red
Country flag
Mine just updated. The tracker moved back to "Order confirmed" but the extended details changed.

Extended Details
Market

USA
Allocation Region
71
Primary Status
In Transit
Last Completed Status
Shipped CONVOY (03/31/2025 11:43)
Invoice Date
02/21/2025
Build Week
02/24/2025
Build Date
03/01/2025
Product Verification Date
03/03/2025
Transit Days
22
Release Date
03/24/2025
Shipped Date
--
ETA
04/21/2025 - 04/27/2025 (Code 32)
Final Delivered Date
--
 

WindBlueP

Active Member
Joined
Feb 15, 2025
Threads
1
Messages
34
Reaction score
31
Location
USA
Vehicles
2025 Mach-E GT
Dealer told me their status shows it in Dallas. Here's what my page looks like
Ford Mustang Mach-E List of 2025 Orders and Times 2025-03-31 12_39_48-My Account
 

ZombieJester

Well-Known Member
First Name
Josh
Joined
Apr 8, 2022
Threads
6
Messages
199
Reaction score
133
Location
Lake Forest, CA
Vehicles
2025 Shadow Black Mach-E Premium Extended/ Retired: 21 Mache-X Rapid Red
Country flag
Ok now the order tracking has taken a dump :poop:
The Order Number and VIN entered do not match with a corresponding vehicle order.
That means they are updating tracking. This happened last Monday and when it was done, everyone was updated.
 
OP
OP
Pioneer898

Pioneer898

Well-Known Member
Joined
Dec 15, 2024
Threads
1
Messages
117
Reaction score
259
Location
AK
Vehicles
2025 GTPE | 2013 Ford Fusion | 2000 Yamaha V-Star 1100 Classic
Occupation
Software Engineer
I was wondering why it seems like everyone else had Transit Days but mine was blank, but it looks like it just updated. 62 so far haha.
Code:
Primary Status
In Transit

Last Completed Status
Received (03/24/2025 09:26)

Invoice Date
02/21/2025

Build Week
02/24/2025

Build Date
03/01/2025

Product Verification Date
03/01/2025

Transit Days
62

Release Date
03/30/2025

Shipped Date
03/31/2025

ETA
05/15/2025 - 05/21/2025 (Code 32)
@DragonmasterLou, maybe check again now as it seems like some more data just dropped?