4sallypat
Well-Known Member
- First Name
- Pat
- Joined
- Mar 30, 2022
- Threads
- 103
- Messages
- 2,806
- Reaction score
- 2,463
- Location
- Southern California
- Website
- www.kudo-ume-farms.com
- Vehicles
- '23 MME delivered May '23 + '22 Lightning July '22
- Occupation
- Network Tech
- Thread starter
- #1
This is certainly exciting for those that travel the I5 corridor from Nor Cal and So Cal.
Opened July 4th - half (84) are open and operational!
https://www.teslarati.com/tesla-massive-solar-supercharger-california/
This Supercharger location is off grid / solar powered which means it's not tied to the power grid - making it perfect for grid down (power outage) situations.
Since I drive that way, I will be stopping by to try it out.....
But currently it says it is temporarily off line ?
Opened July 4th - half (84) are open and operational!
https://www.teslarati.com/tesla-massive-solar-supercharger-california/
This Supercharger location is off grid / solar powered which means it's not tied to the power grid - making it perfect for grid down (power outage) situations.
Since I drive that way, I will be stopping by to try it out.....
But currently it says it is temporarily off line ?
Sponsored