10/24 Build date

OP
OP
Scc18603

Scc18603

Well-Known Member
First Name
Steven
Joined
Apr 15, 2022
Threads
25
Messages
103
Reaction score
60
Location
PA
Vehicles
Ordered 22 Mach e rwd, red. 17 CTS, 22 Jeep GC
Occupation
Technology director
Country flag
1667411474194.gif

My MME order coming out of Mexico, destination California (built 9/13, shipped 9/15, arrived KC vicinity 9/25, been there ever since.) Yep, 48 days in "shipped status", so far.
Madness…. The wait seems like it will never end.
 
OP
OP
Scc18603

Scc18603

Well-Known Member
First Name
Steven
Joined
Apr 15, 2022
Threads
25
Messages
103
Reaction score
60
Location
PA
Vehicles
Ordered 22 Mach e rwd, red. 17 CTS, 22 Jeep GC
Occupation
Technology director
Country flag

xaudiblex

Well-Known Member
Joined
Mar 28, 2022
Threads
2
Messages
238
Reaction score
163
Location
Dallas
Vehicles
Ford Mustang Mach E
Country flag
My dealership texted, car is “produced”, but my status is still in production, 10/29, I do have a rear tag and modules, batch 9038, 316/686. Dealer did state I am locked in on price and locked in on Ford interest rates on order date, 3/17. Have no idea what the rates were then, if anyone knows a site with that information, that would be great.
My order date is March 26, 2022. For my Select model order, it's 2.49% for up to 72 months. I think GT's have a better APR but not certain.
 

Odiethedog

Well-Known Member
First Name
Gary
Joined
Sep 26, 2022
Threads
0
Messages
66
Reaction score
23
Location
Canada
Vehicles
Mach E Premium AWD SR
Country flag
Talked to ford chat this earlier.

As of this afternoon, my mach-e has made it's way to Laredo, Texas.

Next stop, Kansas city!

Anyone else got new updates on their status?
 


Todd44

Well-Known Member
First Name
Todd
Joined
Mar 18, 2022
Threads
3
Messages
103
Reaction score
64
Location
Dade City, FL
Vehicles
Leaf, MME Select, Red, RWD ordered 3/17/22
Occupation
Software Developer Manager
Country flag
Still not built. In production date of 10/29, modules, tear tag, maybe today it moves to built.
 

Zigma51

Well-Known Member
First Name
Dustin
Joined
Jul 6, 2022
Threads
9
Messages
169
Reaction score
100
Location
Moses Lake, WA
Vehicles
2022 Mustang Mach E GT
Occupation
Microsoft
Country flag
Still not built. In production date of 10/29, modules, tear tag, maybe today it moves to built.
Same as you, I am told it was produced on Oct 27th and my ETA is December 12th to 18th
 
First Name
RK
Joined
Oct 12, 2022
Threads
0
Messages
16
Reaction score
8
Location
98258
Vehicles
Ordered MACH-E Premium AWD
Country flag
Mine turned as built this morning; Batch 9038, in production date 10/29, but started since 10/21, built 11/2, awaiting shipment now
 

Fremont Kid

Well-Known Member
First Name
Steve
Joined
Oct 8, 2022
Threads
12
Messages
773
Reaction score
667
Location
Colorado Springs, CO
Vehicles
2022 Mustang Mach e Premium AWD
Occupation
Retired IT
Country flag
My dealer called me today. My Mach e got picked up to be built 10/24. They gave me my VIN. Still going to be a 2022 car.
I ordered 12-27-2021. Build completed in October, 2022. Delivery scheduled between 10-27 and 11-2. Last weekend, 10-30, I saw on my Ford account site that the delivery date changed to between 11-30 and 12-6. Also a Ford rep told me the car travelled from Kansas City to Elkhart, IN, only 3 hours from where I live in Illinois. Somehow the rail car went through Illinois without unloading my Mach-e. Spoke to my dealer yesterday who is as frustrated as me at the conundrum of how Ford needs 30 days to move the vehicle a 3-hour car drive. Main point: FORCE your dealer to be in CONSTANT CONTACT with Ford. Force knowing delivery routes, stops, where it should be off-loaded from rail then to car hauler then to dealer. Get as much detail as possible as early as possible. Ford has lost much credibility with me.
 

Bigfeets

Well-Known Member
First Name
JM
Joined
Dec 10, 2021
Threads
5
Messages
1,403
Reaction score
821
Location
Southern California
Vehicles
Ford MMe premium order. Hyundai Ioniq 5 Lrd
Occupation
retired
Country flag
Talked to ford chat this earlier.

As of this afternoon, my mach-e has made it's way to Laredo, Texas.

Next stop, Kansas city!

Anyone else got new updates on their status?
My 11/3 update: ordered 12/7/21, built 9/13/22, has been in "shipped status" for 49 days so far, destined for California, and has been sitting at Richards-Gebaur KCS yard, ramp 6R, Missouri for all but 10 of that. Thunderstorms in the region tonight. MME on a train would be inside the enclosed autorack, but lots of stalled MME are sitting in the open, picture of my MME from 10/3.
Ford Mustang Mach-E 10/24 Build date 1667506360685

The "good news", it doesn't appear that Canadian deliveries or midwest. eastern US deliveries are being held up as much as some western deliveries, such as California, Colorado, Texas.
 

Fremont Kid

Well-Known Member
First Name
Steve
Joined
Oct 8, 2022
Threads
12
Messages
773
Reaction score
667
Location
Colorado Springs, CO
Vehicles
2022 Mustang Mach e Premium AWD
Occupation
Retired IT
Country flag
I ordered 12-27-2021. Build completed in October, 2022. Delivery scheduled between 10-27 and 11-2. Last weekend, 10-30, I saw on my Ford account site that the delivery date changed to between 11-30 and 12-6. Also a Ford rep told me the car travelled from Kansas City to Elkhart, IN, only 3 hours from where I live in Illinois. Somehow the rail car went through Illinois without unloading my Mach-e. Spoke to my dealer yesterday who is as frustrated as me at the conundrum of how Ford needs 30 days to move the vehicle a 3-hour car drive. Main point: FORCE your dealer to be in CONSTANT CONTACT with Ford. Force knowing delivery routes, stops, where it should be off-loaded from rail then to car hauler then to dealer. Get as much detail as possible as early as possible. Ford has lost much credibility with me.
Update! Sales rep just called to tell me the Mach-e is in their lot. I'm getting it tomorrow at 10:00 a.m. Interestingly, this dealer has two orders for a Premium with Cyber Orange color. Sales rep checked VIN numbers to confirm mine is one of them. YESSSS!
 

Passistant

Active Member
First Name
Brian
Joined
Feb 21, 2022
Threads
0
Messages
25
Reaction score
14
Location
Philadelphia
Vehicles
Acura MDX (ordered 2022 Ford Mach E premium)
Occupation
Physician Assistant
Country flag
Mine turned as built this morning; Batch 9038, in production date 10/29, but started since 10/21, built 11/2, awaiting shipment now
Great new for you! Mine was built 11/3.
 

Todd44

Well-Known Member
First Name
Todd
Joined
Mar 18, 2022
Threads
3
Messages
103
Reaction score
64
Location
Dade City, FL
Vehicles
Leaf, MME Select, Red, RWD ordered 3/17/22
Occupation
Software Developer Manager
Country flag
Great new for you! Mine was built 11/3.
Still not built, 9038 316/686, in production 10/24, in production date of 10/29, but still not built, tear tag and modules all present. Dealer said it was “produced”, whatever that means. Got the Ford “sorry about the delays” email.
 

FirstPony

Well-Known Member
Joined
Feb 20, 2022
Threads
12
Messages
198
Reaction score
111
Location
North Suburbia of Chicago
Vehicles
'22 AWD ER Prem red/black, '22 Kia Sorento PHEV
Country flag
Still not built, 9038 316/686, in production 10/24, in production date of 10/29, but still not built, tear tag and modules all present. Dealer said it was “produced”, whatever that means. Got the Ford “sorry about the delays” email.
That seems like an impossible set of circumstances together. If the vehicle was "produced", you see the modules and tear tag, I don't see how that could not be "Built". Maybe a website error? Have you chatted with Ford?
Sponsored

 
 







Top