squirreltech
Well-Known Member
- First Name
- Curtis
- Joined
- Jul 22, 2022
- Threads
- 1
- Messages
- 50
- Reaction score
- 35
- Location
- Ottawa, Ontario
- Vehicles
- Mach E Premium AWD SR, Cyber Orange
Mine was in production since 5 Sept and built 20 Sept but the tracker said in production 13 Sept. so it can take a bit. hopefully you see something soon.Anyone else had no progress yet? Mine still
Shows scheduled for production 9/12. So frustrating.
Sponsored