Recently, checked with the Indiana DOT website to see if anything was happening with their roll out of the DCFCharging Infrastructure program. They are making progress. They expect to go out for bids this Fall, with construction starting in 2024 and 2025 depending on the highway.
Also, a check of the Indiana Department of Environmental Management (administering the VW ("diesel gate") trust fund) has contracted with some Indiana utilities for installing DCFCharging stations at some 61 sites. They expect their installation this year. How many chargers at each station was not mentioned. The chargers were described as between 125 and 175 kw units. Both websites had maps of proposed locations.
Those of you, in other states, may want to check in with your state DOTs for their progress. The comments on the websites made clear some states are further advanced than Indiana.
Sponsored

 

kodiakng

Well-Known Member
First Name
David
Joined
Oct 1, 2022
Threads
19
Messages
903
Reaction score
1,408
Location
Oregon
Vehicles
2023 Cyber Orange 4X Mach-E
Country flag

voxel

Well-Known Member
First Name
Nelson
Joined
Sep 6, 2021
Threads
27
Messages
2,032
Reaction score
1,858
Location
Altamonte Springs, FL
Vehicles
22 Mach-E 4X, 23 GC Limited
Occupation
Software Engineer
Country flag
Also, a check of the Indiana Department of Environmental Management (administering the VW ("diesel gate") trust fund) has contracted with some Indiana utilities for installing DCFCharging stations at some 61 sites. They expect their installation this year.
Dieselgate fund were distributed 3-ish years ago. States like Florida have basically done squat with it (20 stall Orlando hub funded by it - is only half-built after 3 years and might get cancelled since Ace Cafe closed it's doors nearby) so I'm not expecting NEVI funds to be quickly distributed and used.
 

voxel

Well-Known Member
First Name
Nelson
Joined
Sep 6, 2021
Threads
27
Messages
2,032
Reaction score
1,858
Location
Altamonte Springs, FL
Vehicles
22 Mach-E 4X, 23 GC Limited
Occupation
Software Engineer
Country flag

kodiakng

Well-Known Member
First Name
David
Joined
Oct 1, 2022
Threads
19
Messages
903
Reaction score
1,408
Location
Oregon
Vehicles
2023 Cyber Orange 4X Mach-E
Country flag
There's a bidding process, then permit process, then building process. Each could take 8-12 months.
thanks for the elucidation but i'm quite aware of the process.