Updated order status for my IB 4X:
Actual build completion date 7/16/21 (three weeks after 06/26/21 production date).
Estimated delivery date now 9/4/21 (originally 8/17/21 and then 10/31/21).
Sponsored

 

oadesign

Well-Known Member
First Name
Bob
Joined
Apr 29, 2021
Threads
43
Messages
873
Reaction score
739
Location
Millbury, MA
Website
oaddesign.com
Vehicles
Mustang Mach-E Premium Extended Range RWD
Occupation
Interactive Design Director
Country flag
Not sure if it matters, but I changed my color back to Cyber Orange. Are VIN's being tracked too?
My understanding is that you can make unlimited changes so long as you haven’t received ‘Scheduled for Production’ email.
 

DanHo

Well-Known Member
First Name
Dan
Joined
Mar 10, 2021
Threads
3
Messages
263
Reaction score
340
Location
Seattle
Vehicles
21 MME RR 4x, 25 Rivian R1T Coming Soon
Country flag
I’m curious - I checked mine again today and it’s back to the week of the 18th, did yours change too?
My window sticker finally showed this morning. How about you?
 

csilvest

Well-Known Member
First Name
Chris
Joined
Apr 28, 2021
Threads
10
Messages
275
Reaction score
192
Location
Idaho
Vehicles
'24 Rapid Red GT, '16 Mustang GT Conv
Occupation
IT Administration
Country flag
My understanding is that you can make unlimited changes so long as you haven’t received ‘Scheduled for Production’ email.
I actually changed back to Cyber-Orange about 4 days AFTER receiving the "Scheduled for Production" email. So far it hasn't seemed to have impacted the order.
 

troublebot

Well-Known Member
Joined
Jan 31, 2021
Threads
12
Messages
250
Reaction score
585
Location
Portland, OR
Vehicles
2021 MME Premium EXT AWD, Infinite Blue
Occupation
Industrial Design & Mechanical Engineering
Country flag
Updated order status for my IB 4X:
Actual build completion date 7/16/21 (three weeks after 06/26/21 production date).
Estimated delivery date now 9/4/21 (originally 8/17/21 and then 10/31/21).
Interestingly another user who is waiting for a replacement Extended Range battery in TX said that part of the delay in getting the replacement is that the battery packs were on "backorder" until the 16th, when your car was finally finished. Maybe they were waiting for more EX batteries for the cars that had been dropped in the 10/31 queue (mine included). I have the same configuration as you, my production date was 6/12 and is still in the 10/31 queue but maybe there's hope?
 


ZuleMME

Well-Known Member
First Name
Zule
Joined
Apr 23, 2021
Threads
10
Messages
1,018
Reaction score
1,487
Location
Denver, CO
Vehicles
21' Job1 P4X MME, 22' MYP
Occupation
Implementation Engineer
Country flag
Same, my 10/31 postponed order seems to have completed yesterday with a built date of 7/16. Thinking it was those batteries. Hoping we all get back on track and a large shipment is likely to follow shortly here.
 

jennq

Well-Known Member
First Name
Jenn
Joined
Jul 16, 2021
Threads
1
Messages
253
Reaction score
238
Location
San Diego
Vehicles
Tesla S/3/Y, Mach e GTP, Canoo/Lightning/R1S Resy
Country flag
Added order to tracker
 

hughstev

Active Member
First Name
Hugh
Joined
Nov 11, 2019
Threads
11
Messages
36
Reaction score
29
Location
Newport Beach, CA
Vehicles
2021 GT-PE Grabber Blue
Occupation
Retired
Country flag
Update
Mustang Mach-E GTPE
Grabber Blue 3FMTK4SX0MME00079
3FMTK4SX0MME00079
Reservation 6945 made 11/19/2019

Order Number 10006945
Order Date 4/27/2021

Scheduled for Production
Week of 7/18/2021
 

Bobobobob

Active Member
First Name
Bob
Joined
Mar 16, 2021
Threads
1
Messages
26
Reaction score
32
Location
Illinois
Vehicles
2021 Mustang Mach E
Country flag
Submitted Updates:

Ordered 3/16/2021
Estimated build week was 6/21/2021
Actual build start was 6/28/2021
Actual build date was 7/16/21
Estimated dealer delivery is now 9/6/2021 after originally being pushed back to 10/31/21.
As of 7/20/21, Ford Vehicle Order Tracking finally shows car as 'shipped.' PALSAPP still shows same 'pending' status.
 

troublebot

Well-Known Member
Joined
Jan 31, 2021
Threads
12
Messages
250
Reaction score
585
Location
Portland, OR
Vehicles
2021 MME Premium EXT AWD, Infinite Blue
Occupation
Industrial Design & Mechanical Engineering
Country flag
Looking at people who were dropped in the 10/31 queue (me included) I'm noticing that it's cars with later build dates that are the ones now getting "built/shipped" notifications first. I was at the front end of the group so will probably be near the last to get cleared. I'm just guessing they started parking the unfinished/waiting for parts MMEs in the back corner of a lot and when the batteries/parts became available they started working backward to finish the cars rather than starting with the oldest cars first.

yay
 

Accord07

Well-Known Member
Joined
Dec 5, 2020
Threads
4
Messages
557
Reaction score
742
Location
Earth
Vehicles
Yugo
Looking at people who were dropped in the 10/31 queue (me included) I'm noticing that it's cars with later build dates that are the ones now getting "built/shipped" notifications first. I was at the front end of the group so will probably be near the last to get cleared. I'm just guessing they started parking the unfinished/waiting for parts MMEs in the back corner of a lot and when the batteries/parts became available they started working backward to finish the cars rather than starting with the oldest cars first.

yay
Saw your timeline in another thread. I was surprised, because an identical vehicle including the Infinite Blue paint color was ordered on 3/2, built on 6/21, shipped on 6/22, transferred to Norfolk Southern in Kansas City on 7/8, and delivered to one of my local dealers yesterday. Your vehicle was probably built right before that one but somehow hasn't been shipped. On another note, except the difference in exterior color and order date (mine was ordered on 2/14) my order is exactly the same as that one, including dealer selection, yet it is at least 4-5 weeks behind. Oh well, it will get here eventually.
 

willowma

Well-Known Member
Joined
Feb 28, 2021
Threads
8
Messages
98
Reaction score
58
Location
Lexington, MA
Vehicles
MME Premium ER AWD on order
Country flag
Saw your timeline in another thread. I was surprised, because an identical vehicle including the Infinite Blue paint color was ordered on 3/2, built on 6/21, shipped on 6/22, transferred to Norfolk Southern in Kansas City on 7/8, and delivered to one of my local dealers yesterday. Your vehicle was probably built right before that one but somehow hasn't been shipped. On another note, except the difference in exterior color and order date (mine was ordered on 2/14) my order is exactly the same as that one, including dealer selection, yet it is at least 4-5 weeks behind. Oh well, it will get here eventually.
Think someone just got lucky. I ordered IB 4X on February 23 with June 20 Build date. Actual production date was June 26 with August 17 ETA. Then got caught In the Oct 31 hold until Built status on July 16 with September 4 ETA. Now says transit 38 days with ETA August 28 to Sept 3 to MA. Still does not have ship date so waiting for this to show.
 

Polymon

Member
First Name
Bob
Joined
Jan 12, 2021
Threads
4
Messages
24
Reaction score
23
Location
Apex, North Carolina
Vehicles
2006 Odyssey, 2011 Tacoma, 2021 MachE Space White
Occupation
eCommerce Developer
Country flag
Space White Premium AWD Std Range
Ordered 2/15/21
Built 5/27/21
Delivered to KC: 6/11/21 (via palsapp.com)
Delivery estimate: originally 7/8-14/21. Updated on 7/20/21 to 8/17-8/23

Let me get this right: it takes 66 to 72 days to get a car from KC to NC ?

Sure, that's 1000 miles, but 15 miles per day?
What, is it on the space shuttle tractor that goes 1 mile per hour?
Ford has a problem!
 

Bobobobob

Active Member
First Name
Bob
Joined
Mar 16, 2021
Threads
1
Messages
26
Reaction score
32
Location
Illinois
Vehicles
2021 Mustang Mach E
Country flag
Think someone just got lucky. I ordered IB 4X on February 23 with June 20 Build date. Actual production date was June 26 with August 17 ETA. Then got caught In the Oct 31 hold until Built status on July 16 with September 4 ETA. Now says transit 38 days with ETA August 28 to Sept 3 to MA. Still does not have ship date so waiting for this to show.
My details are almost exactly the same @willowma ! nice to see a better ETA, but would love a shipping date!