jimitoast
Well-Known Member
- First Name
- Jim
- Joined
- Oct 12, 2021
- Threads
- 1
- Messages
- 136
- Reaction score
- 86
- Location
- San Antonio, TX
- Vehicles
- 2 Acuras (MDX, TL), 2022 Mach E GTPE
- Occupation
- Shepherd
We seem to have multiple threads on the same topic. Here's hoping that we can consolidate (hopefully nobody invested in who "came first"). Posting to this one since it has a newer response even though it doesn't use the same title format as prior build week threads. FWIW, I just checked my status using the link from the Ford email notifying me of my production week and I now have an estimated delivery of 3/1/22. My batch/sequence (or whatever the heck this means) is 3713 (206 of 300).
<EDIT> I am GTPE loaded (bluecruise) and I am in San Antonio (maybe a best case for lead time).
<EDIT> I am GTPE loaded (bluecruise) and I am in San Antonio (maybe a best case for lead time).
Sponsored
Last edited: