4/11/22 build week chat

option

Member
Joined
Oct 1, 2021
Threads
0
Messages
21
Reaction score
27
Location
San Jose, CA
Vehicles
BMW E92
Country flag
Batch 5272 - 114/330

No action today either (no modules)

Window sticker shows this:
ACTIVE PARK ASSIST - PREP KIT: -325

Does that mean that they will just install it at a later time (and we will have to pay 325?)

We're getting closer :)

---------
2022 PREMIUM RWD 5-PASSENGER
91KWH USABLE EXT BATTERY SINGLE-SPEED TRANSMISSION
EXTERIOR: DARK MATTER GRAY
INTERIOR: BLK PERFORATED ACTIVEX
 


option

Member
Joined
Oct 1, 2021
Threads
0
Messages
21
Reaction score
27
Location
San Jose, CA
Vehicles
BMW E92
Country flag
Same here:
Batch 5272 - 114/330
980 modules installed as of now

---------
2022 PREMIUM RWD 5-PASSENGER
91KWH USABLE EXT BATTERY SINGLE-SPEED TRANSMISSION
EXTERIOR: DARK MATTER GRAY
INTERIOR: BLK PERFORATED ACTIVEX
 

PNWJustin

Well-Known Member
First Name
Justin
Joined
Apr 6, 2022
Threads
1
Messages
73
Reaction score
74
Location
Seattle
Vehicles
2022 Premium EAWD
Country flag
Hey All :)

Just joining in on this thread, been reading through the forums for a while. With build week finally here, figured time to join in on the fun.

2022 Premium ER AWD
Order Date: 9/11/2021

Build Week 4/11/2022
Batch 5272 290/330

As a newbie, I've been trying to figure out what the Module information is referring to with tracking status. Can someone give me some insight? I'm not sure what it's supposed to look like - When I tracked mine, this is all I found:

Ford Mustang Mach-E 4/11/22 build week chat 1649878375178
 

Ninja4hire

Well-Known Member
First Name
Andre
Joined
Jan 13, 2022
Threads
2
Messages
160
Reaction score
188
Location
Bay Area, CA
Vehicles
2022 Shadow Black Mach-e GT, 2018 Camaro SS
Occupation
Not a paid assassin!
Country flag
Hey All :)

Just joining in on this thread, been reading through the forums for a while. With build week finally here, figured time to join in on the fun.

2022 Premium ER AWD
Order Date: 9/11/2021

Build Week 4/11/2022
Batch 5272 290/330

As a newbie, I've been trying to figure out what the Module information is referring to with tracking status. Can someone give me some insight? I'm not sure what it's supposed to look like - When I tracked mine, this is all I found:

1649878375178.webp
You will see a big list of them whenever it happens. Trust me, you will know :D
edit: The modules really don't tell you much, but that things are moving along. Basically everything in the car is considered a module, so it's just saying that work is being done on your build
 
Last edited:
OP
OP

RMoore

Well-Known Member
First Name
Rob
Joined
Jul 25, 2021
Threads
75
Messages
1,139
Reaction score
801
Location
New Jersey
Vehicles
Audi Q5, Toyota Sienna, 2022 Mach e
Country flag
Hey All :)

Just joining in on this thread, been reading through the forums for a while. With build week finally here, figured time to join in on the fun.

2022 Premium ER AWD
Order Date: 9/11/2021

Build Week 4/11/2022
Batch 5272 290/330

As a newbie, I've been trying to figure out what the Module information is referring to with tracking status. Can someone give me some insight? I'm not sure what it's supposed to look like - When I tracked mine, this is all I found:

1649878375178.png
I am same batch as you and 12 spots behind you on line (or perhaps more precisely, a lower number by 12) and I show the same thing when I use the module tracker.
 

FarSide

Well-Known Member
Joined
Oct 16, 2021
Threads
2
Messages
244
Reaction score
185
Location
Fairfield, CT
Vehicles
Jaguar F-Type '70 Vet, Outback Onyx, '04 Wrangler
Country flag
Okay, I now have activity - Batch 5272 281/330. BCE Modules only; I don't know how many but I have 1,006 rows of data.

I have been praying not to get a Monday Car, especially the Monday after Easter in Mexico.
 

MachEMaster

Well-Known Member
First Name
Will
Joined
Jan 25, 2022
Threads
27
Messages
1,052
Reaction score
1,212
Location
Canada
Vehicles
1997 GMC Yukon GT
Occupation
Aircraft Maintenance Engineer
Country flag
Okay, I now have activity - Batch 5272 281/330. BCE Modules only; I don't know how many but I have 1,006 rows of data.

I have been praying not to get a Monday Car, especially the Monday after Easter in Mexico.
I would be more worried about getting a car built at 4:30pm Thursday, before Good Friday! Lol
 
Last edited:

Carl22

Member
Joined
Sep 7, 2021
Threads
1
Messages
10
Reaction score
7
Location
Florida
Vehicles
MachE (waiting)
Country flag
Also long time reader/lurker

2022 Premium ER RWD
Order Date: 8/22/2021

Build Week 4/11/2022
Batch 5272 105/330

Currently at 980 rows/modules
 

FauxOperator

Member
Joined
Nov 7, 2021
Threads
2
Messages
6
Reaction score
3
Location
NY
Vehicles
2020 Toyota Tundra, 2022 Mach-E (On Order)
Country flag
My MachE was ordered on 11/6/2021. It was built on 4/12/2022, and got notice today that it has shipped.

Canceling my order though, so my dealer will have a nice fresh Cal. Route 1 MachE on their lot. Went with a Tesla instead. ?
Sponsored

 
 







Top