Mach Drop Build Updates

ChasingCoral

Well-Known Member
First Name
Mark
Joined
Feb 3, 2020
Threads
502
Messages
14,316
Reaction score
28,672
Location
Maryland
Vehicles
2021 GB E4X FE, 2022 F-150 Lightning Lariat ER
Occupation
Retired oceanographer
Country flag
Your car is the first one that I've seen with a "1" in the 13th place on the VIN.....

Where is ChasingCoral? How does that line up with your projected 10,000 th unit projection?
We've already heard that VINs are assigned at scheduling and do not reflect build order.
Sponsored

 

ChasingCoral

Well-Known Member
First Name
Mark
Joined
Feb 3, 2020
Threads
502
Messages
14,316
Reaction score
28,672
Location
Maryland
Vehicles
2021 GB E4X FE, 2022 F-150 Lightning Lariat ER
Occupation
Retired oceanographer
Country flag

ChasingCoral

Well-Known Member
First Name
Mark
Joined
Feb 3, 2020
Threads
502
Messages
14,316
Reaction score
28,672
Location
Maryland
Vehicles
2021 GB E4X FE, 2022 F-150 Lightning Lariat ER
Occupation
Retired oceanographer
Country flag

SnBGC

Well-Known Member
First Name
Greg
Joined
Apr 20, 2020
Threads
46
Messages
5,962
Reaction score
9,778
Location
Phoenix
Vehicles
2021 Mach-E FE, 2021 Wrangler 4xe High Altitude
Occupation
Manager
Country flag
We've already heard that VINs are assigned at scheduling and do not reflect build order.
Yes but it can be a guide. In many cases they do go down the line in order. It just isnt in exact order but it isn't off by much unless something unexpected happens. I used the partial VIN sequences published last week to determine about 900 units per week which turned out to be pretty close to actual.

In the whole scope of things, it doesn't matter because production quantities have not been constant since VIN sequences were assigned. Even the PP units have VINs.
 


RonTCat

Well-Known Member
First Name
Ron
Joined
Jul 21, 2020
Threads
27
Messages
1,136
Reaction score
2,980
Location
USA
Vehicles
Mach-E wannabuy
Country flag
Yes but it can be a guide. In many cases they do go down the line in order. It just isnt in exact order but it isn't off by much unless something unexpected happens. I used the partial VIN sequences published last week to determine about 900 units per week which turned out to be pretty close to actual.

In the whole scope of things, it doesn't matter because production quantities have not been constant since VIN sequences were assigned. Even the PP units have VINs.
If you look on an invoice (window sticker), there is the 4 digit rotation number. That is the order they are built in for a particular plant.
 

JellyBelly

Well-Known Member
First Name
Kris
Joined
Jun 27, 2020
Threads
14
Messages
2,489
Reaction score
1,944
Location
San Diego
Vehicles
MME RR FE
Country flag
Your car is the first one that I've seen with a "1" in the 13th place on the VIN.....

Where is ChasingCoral? How does that line up with your projected 10,000 th unit projection?
My MachDrop build date 1/4 has 1 in that place as well but my Premium with a 2/8 build date has a 0 in that place i.e. earlier number and there is 1500 number difference between them.
I am thinking the Premium was scheduled earlier with a VIN but given a later build date but the MachDrop was scheduled later so higher VIN number but given an earlier build date being an FE ?
 

SnBGC

Well-Known Member
First Name
Greg
Joined
Apr 20, 2020
Threads
46
Messages
5,962
Reaction score
9,778
Location
Phoenix
Vehicles
2021 Mach-E FE, 2021 Wrangler 4xe High Altitude
Occupation
Manager
Country flag
My MachDrop build date 1/4 has 1 in that place as well but my Premium with a 2/8 build date has a 0 in that place i.e. earlier number and there is 1500 number difference between them.
I am thinking the Premium was scheduled earlier with a VIN but given a later build date but the MachDrop was scheduled later so higher VIN number but given an earlier build date being an FE ?
Yeah. That does seem unusual to me. The Mach Drop cars appear to be very much a wildcard in this entire process.
 

dbsb3233

Well-Known Member
First Name
TimCO
Joined
Dec 30, 2019
Threads
56
Messages
10,100
Reaction score
11,965
Location
Colorado, USA
Vehicles
2021 Mustang Mach-E FE, 2025 Porche Macan Electric
Occupation
Retired
Country flag
My MachDrop build date 1/4 has 1 in that place as well but my Premium with a 2/8 build date has a 0 in that place i.e. earlier number and there is 1500 number difference between them.
I am thinking the Premium was scheduled earlier with a VIN but given a later build date but the MachDrop was scheduled later so higher VIN number but given an earlier build date being an FE ?
My Machdrop VIN ends in 10xxx too. It appears all the Machdrops have 1/4 builds. And so far it appears they're the last of the FEs (NA anyway). FEs appear to be semi-weighted to the front end of production, but only semi. Basically scattered throughout the first 8 weeks along with a bunch of Premiums and leftover FCTPs. Meaning we'll get our FEs more than a month after many have gotten their Premiums.

I think we're knocking ourselves out looking for patterns that have way more unknown criteria to it than we wish it did.
 

mbia

Well-Known Member
First Name
Matt
Joined
Dec 31, 2019
Threads
8
Messages
138
Reaction score
263
Location
Tampa, Florida
Vehicles
‘25 Porsche Macan 4 Electric & ‘21 BMW X5 xDrive40i
Country flag
My Machdrop VIN ends in 10xxx too. It appears all the Machdrops have 1/4 builds. And so far it appears they're the last of the FEs (NA anyway). FEs appear to be semi-weighted to the front end of production, but only semi. Basically scattered throughout the first 8 weeks along with a bunch of Premiums and leftover FCTPs. Meaning we'll get our FEs more than a month after many have gotten their Premiums.

I think we're knocking ourselves out looking for patterns that have way more unknown criteria to it than we wish it did.
My MachDrop VIN, also scheduled for 1/4, ends in 104xx too.
 

JellyBelly

Well-Known Member
First Name
Kris
Joined
Jun 27, 2020
Threads
14
Messages
2,489
Reaction score
1,944
Location
San Diego
Vehicles
MME RR FE
Country flag
Yeah. That does seem unusual to me. The Mach Drop cars appear to be very much a wildcard in this entire process.
They seem to be ...not wildcards necessarily but we now know theirs VINs were given later than others. At this point it does not matter - hoping the build dates stick and hoping for shortest delivery time what ever that may be.
 

jdmrc93

Well-Known Member
First Name
Joe
Joined
Jun 25, 2020
Threads
21
Messages
387
Reaction score
1,012
Location
Allen Park, MI, USA
Vehicles
2024 Mustang Mach-E GT Performance
Occupation
IT Network Engineer & Systems Architect
Country flag
So, at the end of MY fiasco, my dealer just called me. The good news: They found my Mach Drop order, and it is scheduled for build the week of Jan 4th. The interesting news: They placed the order in the wrong dealer's order bank. I ordered mine and told them Crest Ford Flat Rock, but they sent it to Crest Ford Center Line. Thankfully, they are the same owners so they will just do a swap. Incompetence at the fault of the Mach Drop team. But at least I have an answer, and something to look forward to. ?

Funny thing is, this build is a couple weeks sooner than my original premium order, which is scheduled for the week of Jan 25th. That order can't be canceled since it's already scheduled. So my dealer will have an extra Mach-E Premium lying around. "Don't worry, someone will buy it... and fast".
 

dbsb3233

Well-Known Member
First Name
TimCO
Joined
Dec 30, 2019
Threads
56
Messages
10,100
Reaction score
11,965
Location
Colorado, USA
Vehicles
2021 Mustang Mach-E FE, 2025 Porche Macan Electric
Occupation
Retired
Country flag
So, at the end of MY fiasco, my dealer just called me. The good news: They found my Mach Drop order, and it is scheduled for build the week of Jan 4th. The interesting news: They placed the order in the wrong dealer's order bank. I ordered mine and told them Crest Ford Flat Rock, but they sent it to Crest Ford Center Line. Thankfully, they are the same owners so they will just do a swap. Incompetence at the fault of the Mach Drop team. But at least I have an answer, and something to look forward to. ?

Funny thing is, this build is a couple weeks sooner than my original premium order, which is scheduled for the week of Jan 25th. That order can't be canceled since it's already scheduled. So my dealer will have an extra Mach-E Premium lying around. "Don't worry, someone will buy it... and fast".
Glad to hear it's cleared up.

It doesn't really surprise me they got a similarly-named dealerships mixed up. This is why I hate doing things on the phone rather than online. The chances of getting a small detail misheard or mis-transcribed is always high. A name misspelled... 2 numbers transposed... a detail forgotten... an item misunderstood... And worst of all - no written audit trail!!

I intentionally did nearly all my communications with Ford and my dealer by email, except for the initial MachDrop call which (unfortunately) had to be by phone.