dbsb3233
Well-Known Member
- First Name
- TimCO
- Joined
- Dec 30, 2019
- Threads
- 56
- Messages
- 10,100
- Reaction score
- 11,965
- Location
- Colorado, USA
- Vehicles
- 2021 Mustang Mach-E FE, 2025 Porche Macan Electric
- Occupation
- Retired
No but we have FE build dates throughout Dec and even into Jan. Then add shipping time. So unless there's no non-FE deliveries in 2020, seems like a number of non-FEs will deliver before all FEs deliver.We still don't know that they won't. All we have so far are build dates. Does anyone have promised delivery dates?
It's possible they could hold all non-FEs at the plant for delivery till 2021 to get the FEs delivered first, but it seems unlikely they'd do that. But who knows. Nothing would totally surprise me at this point.
Sponsored