TigerJohn
Active Member
- First Name
- John
- Joined
- Dec 17, 2021
- Threads
- 1
- Messages
- 39
- Reaction score
- 13
- Location
- Gainesville, FL
- Vehicles
- 2022 CA Route 1 (on order)
Same!Batch 4025. In production 2/4. Still on chip hold, no updates![]()
Sponsored
Same!Batch 4025. In production 2/4. Still on chip hold, no updates![]()
Followed another thread and tracking mine .Glad to hear it. Same experience here. Was pushed out to mid -June. Then the car was completed 17 February (got the email) and shipped on 18 February (also got the email). On 21 Feb my delivery date moved to 26 March.
I suspect that 21 March was the day that the train departed the plant. So….now we have 2 data points for this build week.
Anyone figure out PALSAPP?
How about like Wile E Coyote riding an ACME rocket ?.
Don’t worry on paired date, it’s dummy until delivered.{
"s": [
{
"AsnDate": "/Date(1643685487384)/",
"BayedDate": null,
"DealerName": null,
"DeliveryDate": null,
"Description": "Pending",
"Destination": "-",
"DestinationId": "00000000-0000-0000-0000-000000000000",
"DestinationType": null,
"DispatchedDate": null,
"PairedDate": "/Date(-62135596800000)/",
"DocumentCount": 0,
"FreightId": "1363885100",
"LoadId": null,
"Origin": "Kansas City",
"OriginId": "00000000-0000-0000-0000-000000000000",
"OriginType": null,
"TripNumber": "-",
"VehicleStatus": "ASN",
"VinNumber": "3FMTK1RM4NMA13806",
"DocumentList": null,
"RelayInformation": null,
"ShippingNoteId": "c9d6297f-5ec4-4ff5-8ad6-c25656fb524c"
}
]
}I just did the api tester copy and paste as mentioned, this was my result shows same as pals app used to, seems my car has not got to kansas yet, so tells me maybe has not left good ol mexico yet?but yea the api thing works?convert first date shows feb 1/22 and second is (
: Sunday, January 1, 3939 12:00:00 AM
Your time zone: Saturday, December 31, 3938 6:00:00 PM GMT-06:00
Relative: In 1917 years
So we are waiting for a while lol
Oddly, my ASN date ie 1.31.22. Same as build week. But I was built on 2.18 and shipped notice 2.19. Do any of the dates update once the car actually leaves Mexico or is it only updated when it leaves KC?Don’t worry on paired date, it’s dummy until delivered.
You and mine are only 12 mins apart on asn date. Lets keep posted when either of us gets update.
not sure, I have read once it gets to KCOddly, my ASN date ie 1.31.22. Same as build week. But I was built on 2.18 and shipped notice 2.19. Do any of the dates update once the car actually leaves Mexico or is it only updated when it leaves KC?
sure willDon’t worry on paired date, it’s dummy until delivered.
You and mine are only 12 mins apart on asn date. Lets keep posted when either of us gets update.
I think we’re in the same batch so I’m hoping my car isn’t too far off. ? still says 6/12 ETA on the tracker as of now.Got the built email and an updated deliver date of March 21-27.
If that holds true it will be 30-31 weeks since ordering. Not far off the 28+ week estimate given when I ordered.
You can also just open chrome browser>got to palsapp.com>hit f12>control F>type "vin"Glad to hear it. Same experience here. Was pushed out to mid -June. Then the car was completed 17 February (got the email) and shipped on 18 February (also got the email). On 21 Feb my delivery date moved to 26 March.
I suspect that 21 March was the day that the train departed the plant. So….now we have 2 data points for this build week.
Anyone figure out PALSAPP?