Poll - how long have you waited from order to build date?

How long from MY22 Order Confirmed to Build Date Assigned?


  • Total voters
    128

back_at_it_19

Well-Known Member
Joined
Jul 9, 2020
Threads
11
Messages
673
Reaction score
628
Location
Seattle area
Vehicles
'21 Job 1 GB FE and '22 Red Prem4x
Country flag
Just for fun I’d like to see how long everyone has waited from order confirmation to build date assigned? I know builds keep getting pushed but figured build date assigned was a decent general barometer. I’m a happy job 1 first edition GB owner with almost 30k miles, and we ordered another my22 premium 4x red for my wife in February. After the LONG wait from original order to delivery of the FE, we’re happy waiting now. Wonder if it’ll be delivered this year or next…
Sponsored

 

River Rat

Well-Known Member
First Name
John
Joined
Mar 16, 2022
Threads
5
Messages
243
Reaction score
177
Location
Britt, Ontario, Canada
Vehicles
22 Mustang Mach Ex Iced Bue, 23 Lightning Ext SW
Occupation
Retired
Country flag
102 days if it got built this week which I think it did. 6651 187/330
 

Garbone

Well-Known Member
First Name
Gary
Joined
Dec 16, 2020
Threads
34
Messages
1,280
Reaction score
1,757
Location
Florida
Vehicles
21 Mach E , 22 MachE, 62 C10 Big window long bed
Occupation
Loafer
Country flag
Hoping to get build date this MY but am prepared to choose a new color if I roll to '23. I would be surprised if Space White continues on. I have only seen 2 MachEs in that color and think it is on the chopping block.
 

Efrain

Well-Known Member
First Name
Efrain
Joined
Feb 15, 2022
Threads
1
Messages
53
Reaction score
55
Location
Florida
Vehicles
Mustang Mach E,
Occupation
Retired
Country flag
Hoping to get build date this MY but am prepared to choose a new color if I roll to '23. I would be surprised if Space White continues on. I have only seen 2 MachEs in that color and think it is on the chopping block.
I’ve seen lots of Space Whites, went to the dealer on Thursday and they had three waiting to be picked up once they do the recall. I picked Star White Metallic. Ford built 2021’s until December last year, I imagine they will do the same for 2022.
 

HuntingPudel

Well-Known Member
First Name
Steve
Joined
Mar 23, 2021
Threads
88
Messages
12,942
Reaction score
17,391
Location
Bay Area, CA
Vehicles
2024 MME GT with Performance Upgrade, 1979 Fire-Am, 1972 K/5 Blazer
Occupation
Engineering
Country flag
My response was >20 weeks for my GT-PE. That didn’t include time on reservation, just from order date. ??
 


Bigfeets

Well-Known Member
First Name
JM
Joined
Dec 10, 2021
Threads
5
Messages
1,403
Reaction score
821
Location
Southern California
Vehicles
Ford MMe premium order. Hyundai Ioniq 5 Lrd
Occupation
retired
Country flag
It's June 29. I've been waiting 204 days (29 weeks) without a scheduled build date. What with 2 "no scheduling" dates in June, assembly plant shutdown for 2 weeks in August, and new scheduling being forecast for late August and beyond, it's looking like I might get a "build date" in early September and delivery date in mid October, i.e. ~45 weeks after order confirmation. (inSoCal, Premium AWD ER red)
Ford Mustang Mach-E Poll - how long have you waited from order to build date? 1656522868393

edit: It's 10 August 22. I waited 226 days (32 weeks) for my order to get scheduled (premium AWD ER red). My order was assigned a VIN in the low 50,000s and the scheduled build date was two months away... 9/19, and the delivery ETA is currently 10/29-11/5. If Ford meets this ETA, it will be 11 months between order and delivery. The presumed cause of these delays in scheduling and building, when Select and GT orders are being favored, is that my order is for a "disfavored" premium AWD, and/or I chanced upon a "low allocation" dealer. Now I have to wait and see what further delays may occur in the "shipped" phase.
 
Last edited:

1969Camaro

Well-Known Member
First Name
Joe
Joined
Aug 26, 2021
Threads
12
Messages
313
Reaction score
295
Location
Scottsdale AZ
Vehicles
2021 Mach E Premium, 2018 Prius Prime, 1969 Camaro
Occupation
Engineer
Country flag
Ordered 8/18/21. First build date early April 22. Keep moving until May 23rd.
 

klentz09

Well-Known Member
Joined
Nov 19, 2021
Threads
2
Messages
71
Reaction score
32
Location
Md
Vehicles
mach e
Country flag
Ordered July of 2021. Went into production in October. Still waiting.

I'm probably the last person still waiting on a 2021.

Does anyone know what the record wait time is?
 

ElectrifyME

Well-Known Member
First Name
Carrie
Joined
Apr 13, 2022
Threads
8
Messages
254
Reaction score
151
Location
California
Vehicles
.
Country flag
Ordered July of 2021. Went into production in October. Still waiting.

I'm probably the last person still waiting on a 2021.

Does anyone know what the record wait time is?
That sounds way beyond anything I have read here. Wow, you’re sure they are making your car? You win for patience in my book!
 

klentz09

Well-Known Member
Joined
Nov 19, 2021
Threads
2
Messages
71
Reaction score
32
Location
Md
Vehicles
mach e
Country flag
That sounds way beyond anything I have read here. Wow, you’re sure they are making your car? You win for patience in my book!
It made it into the states a few months ago and was trucked to the railyard in KC on 4 May. They dont know where it is now.
 

voxel

Well-Known Member
First Name
Nelson
Joined
Sep 6, 2021
Threads
27
Messages
2,032
Reaction score
1,858
Location
Altamonte Springs, FL
Vehicles
22 Mach-E 4X, 23 GC Limited
Occupation
Software Engineer
Country flag
Ordered 10/1. Scheduled around 4/18 (might be earlier... I forget). So that's about 199 days.

Delivered 7/3.

275 days. 39 weeks, 2 days.
 

Av8tor

Well-Known Member
First Name
Kevin
Joined
Aug 6, 2021
Threads
30
Messages
708
Reaction score
921
Location
Richmond, VA
Vehicles
Fusion Hybrid, MME GTPE
Occupation
Systems Engineer IOT
Country flag
137 Days to production
13 Day delay in production because of a chip hold
23 Day delay for shipping from the plant, because it missed it's original train car
53 Day delay from KS to dealer
16 Day delay because of the recall hold

8 Months (243 Days) to purchase.
 

dmastro

Well-Known Member
First Name
David
Joined
Mar 17, 2022
Threads
11
Messages
543
Reaction score
722
Location
Roseville, CA
Vehicles
2022 Mach E Premium AWD (ordered), 2018 Tesla M3
Country flag
Ordered 10/29/21 and just received a 7/25 week production window, so if the date holds it'll be a little over 38 weeks from order to production. Add another 8-10 weeks for delivery and likely 48 weeks from order.
 

PalsyWalsy

Well-Known Member
First Name
Patrick
Joined
Dec 24, 2021
Threads
8
Messages
340
Reaction score
612
Location
Illinois
Vehicles
Lexus 400H, Lexus 300H, Buick Enclave, Mach E GT
Occupation
School Administration
Country flag
What if I am right at 20 weeks for my GT? More/less? Plus you should change the GT question to more or less than 28. When I ordered, it said 28+ weeks and I got it at 20 so 8 weeks ahead of time which should be of note. 20 weeks in the question does not due it justice if you got it less than the 28 (since it asks for over).