vikramb92
Active Member
- Joined
- Jun 23, 2020
- Threads
- 1
- Messages
- 29
- Reaction score
- 31
- Location
- Georgia
- Vehicles
- Mach-E 2021, Volt 2017, Ford Focus Electric 2013
- Occupation
- Engineer
- Thread starter
- #1
Just got my email from for saying that my Mach-e has been scheduled to be built during the week of December 21, 2020. Not sure how to feel since that means I won't get the vehicle until 2021.
Edit: For Context I reserved the Mach-E 1am the night after the Mach-e Reveal (11/18/19). My reservation number is 10007841, and I initially reserved a RWD Select Model, placed an order for the select with Technology package and I changed my order to the premium when ford did the price reduction (6/25/20). I had hoped that by upgrading to the Premium that I could have got the car in December. I'm still happy that I'll get the car by the end of January. I'm in Georgia and my dealership is in a suburb of Atlanta.
Edit: For Context I reserved the Mach-E 1am the night after the Mach-e Reveal (11/18/19). My reservation number is 10007841, and I initially reserved a RWD Select Model, placed an order for the select with Technology package and I changed my order to the premium when ford did the price reduction (6/25/20). I had hoped that by upgrading to the Premium that I could have got the car in December. I'm still happy that I'll get the car by the end of January. I'm in Georgia and my dealership is in a suburb of Atlanta.
Sponsored
Last edited: