updates ... updates ... UPDATES !!! 2.4.1 ...2.4.2 ...2.4.3 ...2.4.4. !!!

  • Thread starter Deleted member 3569
  • Start date
  • Watchers 19

dsheib

Well-Known Member
First Name
Dave
Joined
Apr 13, 2021
Threads
3
Messages
104
Reaction score
71
Location
Bridgewater, Massachusetts
Vehicles
Mach E Premium AWD SR, Ducati Multistrada 1200S
Country flag

Gullwingdmc

Well-Known Member
First Name
Chip
Joined
May 15, 2021
Threads
85
Messages
2,945
Reaction score
4,113
Location
Boston, MA
Vehicles
2022 Mustang Mach E GT AWD ER - Grabber Blue
Country flag
Well, they could give us a new target date... ??
I do wonder what the over/under will be for us common folk to start getting these updates. Are we thinking Early April/Late April? May?
 


Blue highway

Well-Known Member
First Name
Steve
Joined
Oct 15, 2021
Threads
5
Messages
2,700
Reaction score
4,249
Location
Oregon
Vehicles
Mach E Premium SR RWD
Country flag
Put pressure on them to do what? Roll out BlueCruise? They're already doing that. It's a lot of cars, so it will take a bit.
How about speed it up a bit? Let's do some hypothetical math....

10K job 1 cars
let's say 2/3 of those have the tech package for BC - that's 6K cars
So far what do you say have been done so far?... 50 EA cars? in the last month... maybe less.
at the roll out rate of 50 cars a month... into 6000 cars...it will take 120 months (10 years) to catch those up at the current rate
Kinda slow wouldn't you say?
 

Mathington

Well-Known Member
Joined
Jul 6, 2021
Threads
20
Messages
882
Reaction score
868
Location
Canada
Vehicles
Mach-E Premium SR AWD
Country flag
I do wonder what the over/under will be for us common folk to start getting these updates. Are we thinking Early April/Late April? May?
I am still hopeful for next week or first week of April.
 

Mathington

Well-Known Member
Joined
Jul 6, 2021
Threads
20
Messages
882
Reaction score
868
Location
Canada
Vehicles
Mach-E Premium SR AWD
Country flag
How about speed it up a bit? Let's do some hypothetical math....

10K job 1 cars
let's say 2/3 of those have the tech package for BC - that's 6K cars
So far what do you say have been done so far?... 50 EA cars? in the last month... maybe less.
at the roll out rate of 50 cars a month... into 6000 cars...it will take 120 months (10 years) to catch those up at the current rate
Kinda slow wouldn't you say?
I think the EA group is relatively small as they were testing things. Now that Ford seems to have the bugs hammered out, I am sure that they could easily scale the deployment to all Job 1 cars quite easily.
 
OP
OP

Deleted member 3569

Guest
Wow. I think I've done all I can do here.
Yes ... I go it ... I am in la la land... but it's OK ... at least it was euphoric while it lasted ... now I have to wait for another ten months before next updates !!!
I am just now wondering who got the highest or latest version of updates?
 

generaltso

Well-Known Member
Joined
Jun 24, 2020
Threads
76
Messages
15,389
Reaction score
28,696
Location
Vermont
Vehicles
2024 Kia EV9 GT-Line
Country flag
How about speed it up a bit? Let's do some hypothetical math....

10K job 1 cars
let's say 2/3 of those have the tech package for BC - that's 6K cars
So far what do you say have been done so far?... 50 EA cars? in the last month... maybe less.
at the roll out rate of 50 cars a month... into 6000 cars...it will take 120 months (10 years) to catch those up at the current rate
Kinda slow wouldn't you say?
Yup, you’ve figured it out. Ford’s plan is to roll it out over 10 years. ?
 

generaltso

Well-Known Member
Joined
Jun 24, 2020
Threads
76
Messages
15,389
Reaction score
28,696
Location
Vermont
Vehicles
2024 Kia EV9 GT-Line
Country flag
Yes ... I go it ... I am in la la land... but it's OK ... at least it was euphoric while it lasted ... now I have to wait for another ten months before next updates !!!
I am just now wondering who got the highest or latest version of updates?
The first wave of EA members have the latest. You‘ll still be getting 2.5.1, 2.5.2, and 2.5.3.
 

Gullwingdmc

Well-Known Member
First Name
Chip
Joined
May 15, 2021
Threads
85
Messages
2,945
Reaction score
4,113
Location
Boston, MA
Vehicles
2022 Mustang Mach E GT AWD ER - Grabber Blue
Country flag
Now that Ford seems to have the bugs hammered out
From the sounds of it 2.4.2 might need a little more refining if it keeps taking some people multiple tries. Not that there’s been any huge issues, but definitely not as smooth as the others.
 
OP
OP

Deleted member 3569

Guest
The first wave of EA members have the latest. You‘ll still be getting 2.5.1, 2.5.2, and 2.5.3.
yes ... I do remember you had mentioned this earlier but I was wondering if anyone has posted that they actually got any updates beyond 2.4.4.
I am certainly not in the privileged group of early EA ... and don't even know how I sneaked into this group either.
 

JellyBelly

Well-Known Member
First Name
Kris
Joined
Jun 27, 2020
Threads
14
Messages
2,489
Reaction score
1,944
Location
San Diego
Vehicles
MME RR FE
Country flag
Today is friday so will know soon. Also read on the forum that updates show up for some between 2-4 pm - at least i noticed that to be the case for 2.4.3 and 2.4.4. Also my FP stopped showing recent update successful msg an hour ago - so hoping thats a sign as well...keeping fingers crossed
Got 2.4.5 - updated successfully - looks like a very short update as it happened automatically with in a few minutes I was stopped at a store for less than 10 minutes. 3.45 pm local time.
Sponsored

 
 







Top