mfbrown
Well-Known Member
- First Name
- Marc
- Joined
- Aug 10, 2021
- Threads
- 3
- Messages
- 173
- Reaction score
- 172
- Location
- San Diego
- Vehicles
- 2021 MME Prem, RWD, ER; 2023 MME Prem, RWD, ER
I talked to my dealer and he says that he has 11 Mach-e's sitting waiting for chips. I mentioned that it sounds like Ford is waiting for a big shipment (the 6-week letter) that will open the flood gates and he agreed. He thinks the chips are due in the next few weeks. That makes me hopeful that my 10/11 build will happen and chips will be available to complete the car.
This would also be consistent with a lot of manufactures shutting down production for two weeks after the Labor Day weekend. When they come back they might be hoping that chips will be available.
This would also be consistent with a lot of manufactures shutting down production for two weeks after the Labor Day weekend. When they come back they might be hoping that chips will be available.
Sponsored